Tender Details
Particulars | Details |
---|---|
Title |
C/O 67.30 Mtr Span Box Cell Bridge Over Singaroo Khad At Rd 1.300 And C/O 22.00 Mtr Span Rcc T Beam Bridge Over Tilagan Khad At Rd 8.610 On Salwala Sataun Road Under Nabard Ridf Xxxix.
|
Description |
Prepartion Of Structural Design And Drawings And Accord Its Approval There Of.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_104977_1 |
Reference Number |
NIT 1282-1381 dated 05.05.2025 |
Tender Fee | 350 |
EMD | 16400 |
Tender Value | |
Place | Shillai |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=153899 |
Start Date | May 08, 2025 19:30 |
End Date |
14/05/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreDesign and construction of 1x35 mtr span steeltrussed girder bridge over nallah sukhnag at mirchimar pattan baramulla on epc mode engineering procurement and construction mode
Design and construction of 1x35 mtr span steeltrussed girder bridge over nallah sukhnag at mirchimar pattan baramulla on epc mode( engineering procurement and construction mode
Read moreConstruction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Construction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Read moreConstruction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii
Construction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii
Read moreConstruciton of high level bridge (2 x 15m) over dalla drain falling on qadian harchowal road (pb06116) at rd 55.00 mtr in district gurdaspur under scheme pmgsy phase iii batch iii district gurdaspur
Construciton of high level bridge (2 x 15m) over dalla drain falling on qadian harchowal road (pb06116) at rd 55.00 mtr in district gurdaspur under scheme pmgsy phase iii batch iii district gurdaspur
Read moreConstruction of high level bridge (3x12.5m), over ubdc falling on shri hargobindpur sahib road nainekot ladhupur kiri afgana upto kahnuwan ghorewah road at rd 1410 mtr in district gurdaspur under scheme pmgsy iii batch iii
Construction of high level bridge (3x12.5m), over ubdc falling on shri hargobindpur sahib road nainekot ladhupur kiri afgana upto kahnuwan ghorewah road at rd 1410 mtr in district gurdaspur under scheme pmgsy iii batch iii
Read moreConstruction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii
Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii
Read moreConstruction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).
Construction of 110 mtr span double lane
 motorable bridge over river beas at pandoh on pandoh
 nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)
 (package no. hp-08-570).
Read moreSsi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Ssi, dgn and constr of two nos maj pmt bdg of span 50m over hmaranglui river at km 98.100 and 45 m over chotta golsuri river at km 140.875 on rd l-d-p incl both side approach road for all two brs under 71 rcc/24 tf under (p) psk in mizoram (2nd call)
Read moreof your Industry type