Tender Details

Particulars Details
Title
Repair Work Of Canal System For Handing Over 359.62 Ha. Area Of Nagesh Mandir Wua At. Alamdoh And 301.49 Ha. Area Of Tulaja Bhavani W.U.A. Ta. Hinganghat Dist. Wardha.
Description
Repair Work Of Canal System For Handing Over 359.62 Ha. Area Of Nagesh Mandir Wua At. Alamdoh And 301.49 Ha. Area Of Tulaja Bhavani W.U.A. Ta. Hinganghat Dist. Wardha.
Organisation Government of Maharashtra
Tender Id 2023_CEWRD_961242_1
Reference
Number
14/LWCD/2023-24
Tender Fee 2360
EMD 29800
Tender Value -
Place EE LWCD Wardha
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date November 08, 2023 15:30
End Date
Expired 22/11/2023

Expired 1056 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair work of canal system for w.u.a. repair work for handing over of command area to w.u.a. and strengthening work of w.u.a. for ashvmegh wua nimbhora bodakha ta.dhamangaon under the jurisdiction of u w i sub div no.4 dattapur.c.c.a. 415.19 hq

Repair work of canal system for w.u.a. repair work for handing over of command area to w.u.a. and strengthening work of w.u.a. for ashvmegh wua nimbhora bodakha ta.dhamangaon under the jurisdiction of u w i sub div no.4 dattapur c.c.a. 415.19 hq

Read more
Conducting election process, crop pattern, demonstration, training, field visit, adaptive trials, water management, handing over, strengthening and empowerment of wua for km 91 to 113 of bembala main canal. (for 11887.63 ha)

Conducting election process, crop pattern, demonstration, training, field visit, adaptive trials, water management, handing over, strengthening and empowerment of wua for km 91 to 113 of bembala main canal. (for 11887.63 ha)

Read more
Construction of gravity based pipe line distribution network for a culturable command area of 320 ha. including surveying, designing, drawings and construction along with delivery chamber including formation of wua, handing over the command area/who

Construction of gravity based pipe line distribution network for a culturable command area of 320 ha. including surveying, designing, drawings and construction along with delivery chamber including formation of wua, handing over the command area/who

Read more
Construction and development of irrigation potential of 98.92 ha. for pauni 1 and pauni 2 minors on main canal of jhasinagar lift irrigation scheme by pipe distribution network, its maintenance for 5 year and handing over to wua.

Construction and development of irrigation potential of 98.92 ha. for pauni 1 and pauni 2 minors on main canal of jhasinagar lift irrigation scheme by pipe distribution network, its maintenance for 5 year and handing over to wua.

Read more
Construction and development of irrigation potential of 98.92 ha. for pauni 1 and pauni 2 minors on main canal of jhasinagar lift irrigation scheme by pipe distribution network, its maintenance for 5 year and handing over to wua.

Construction and development of irrigation potential of 98.92 ha. for pauni 1 and pauni 2 minors on main canal of jhasinagar lift irrigation scheme by pipe distribution network, its maintenance for 5 year and handing over to wua.

Read more
Construction of gravity based pipe distribution network and delivery chamber for cca of 8796 ha formation of wua maintenance of the system for 60 months after completion of pdn and handing over the whole pdn system to water user association

Construction of gravity based pipe distribution network and delivery chamber for cca of 8796 ha formation of wua maintenance of the system for 60 months after completion of pdn and handing over the whole pdn system to water user association

Read more
Const of aashti lis offtaking on lbc of the uwp including pump house, pumping machinery, rising main, pressurized p.d.n network and allied work including formation, handing over of wua maintenance up to 60 months for cultivable command area 2059 ha.

Const of aashti lis offtaking on lbc of the uwp including pump house, pumping machinery, rising main, pressurized p.d.n network and allied work including formation, handing over of wua maintenance up to 60 months for cultivable command area 2059 ha.

Read more
Upper wardha irrigation sub-division no. 2,tivsa under irrigation section kurha under suryaganga water user association, anjanwati, ta. dhamangaon railway for repairing work, empower, strengthening and handing over of distribution system (799.96 ha.)

Upper wardha irrigation sub-division no. 2,tivsa under irrigation section kurha under suryaganga water user association, anjanwati, ta. dhamangaon railway for repairing work, empower, strengthening and handing over of distribution system (799.96 ha.)

Read more
Construction of pdn on khairi pat minor no2 and its sub minor off-taking rd-4670 m on tail distributory from branch canal no-3 of glbc for creatiation of ip of 425 ha with operation and maintenance for 5 years and handing over to wua.

Construction of pdn on khairi pat minor no2 and its sub minor off-taking rd-4670 m on tail distributory from branch canal no-3 of glbc for creatiation of ip of 425 ha with operation and maintenance for 5 years and handing over to wua.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise