Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/Xiv/132/002/25 26
|
| Description |
Desilting, Chokage Removal And Restoration Of Damaged Portion Of Drainage Pipes As S.O.S. Basis (1 St. Phase Fy 25 26) Within Ward No. 132
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_839848_1 |
|
Reference Number |
KMC/XIV/132/002/25-26 |
| Tender Fee | 0 |
| EMD | 10000 |
| Tender Value | - |
| Place | IN WARD NO.-132. |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1872797 |
| Start Date | April 28, 2025 22:30 |
| End Date |
Expired
06/05/2025
Expired 526 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for restoration of damaged lining portion of old chhanga disty (0-68000), mamdot disty (0-56975) and new chhanga disty (0-27500).
Estimate for restoration of damaged lining portion of old chhanga disty (0-68000), mamdot disty (0-56975) and new chhanga disty (0-27500).
Read moreConstruction, removal and shifting of damaged and missing slab of all earthing pit of 220/132/33 kv side, cable trench slab of 220/132/33 kv side and other than 220/132/33 kv at 220kv/132kv/33 kv gss campus ,ulijhari
Construction, removal and shifting of damaged and missing slab of all earthing pit of 220/132/33 kv side, cable trench slab of 220/132/33 kv side and other than 220/132/33 kv at 220kv/132kv/33 kv gss campus ,ulijhari
Read moreAllied civil works for damaged 160/100 mva t/f 220/132/66 kv in the jurisdiction of civil works sub-division amritsar for fy 2026-27.
Allied civil works for damaged 160/100 mva t/f 220/132/66 kv in the jurisdiction of civil works sub-division amritsar for fy 2026-27.
Read moreMacadamization of captain sunil chowdhary chowk to dream land park incl. fruit mandi road incl. damaged portion of ambedkar bridge to fruit mandi road (under permanent restoration sasci-i)
Refer to boq
Read moreMaint.of of pipe d.s, t.ms and sub mains by way of replace of damaged ones with all items/ fittings (by way of restoration of old rwm for wss nengerpora ,replacing old damaged pipes and welding ) under m and r.
Maint.of of pipe d.s, t.ms and sub mains by way of replace of damaged ones with all items/ fittings (by way of restoration of old rwm for wss nengerpora ,replacing old damaged pipes and welding ) under m and r.
Read morePermanent restoration of 132 kv dc rajouri draba transmission line (hilly and snow bound area) at village kote mera, thanamandi, rajouri damaged during the flash floods of u.t of j and k
Permanent restoration of 132 kv dc rajouri draba transmission line (hilly and snow bound area) at village kote mera, thanamandi, rajouri damaged during the flash floods of u.t of j and k
Read morePermanent restoration of damaged portion of stretch from km 23 00 to 24 00 and km 44 00 to 45 00 and km 56 00 to 60 860 and construction of additional culverts in jalandhar kapurthala sultanpur lodhi makhu road sectionofnh703a inthestateofpunjab
Permanent restoration of damaged portion of stretch from km 23 00 to 24 00 and km 44 00 to 45 00 and km 56 00 to 60 860 and construction of additional culverts in jalandhar kapurthala sultanpur lodhi makhu road sectionofnh703a inthestateofpunjab
Read moreS/r to road from hospital square to subhas bose square padakothi chhak for the year 2026-27. (such as restoration of damaged b.t portion of road due to heavy rainfall in patches from ch. 0/385 km to 0/445 at subhash bose square at ch. 1/634 km.)
S/r to road from hospital square to subhas bose square padakothi chhak for the year 2026-27. (such as restoration of damaged b.t portion of road due to heavy rainfall in patches from ch. 0/385 km to 0/445 at subhash bose square at ch. 1/634 km.)
Read moreS/r to road from subhas bose square to acharya harihar square for the year 2026-27. (such as restoration of damaged b.t portion of road due to heavy rainfall in patches from ch.0/000 km to 0/036 km,0/343 to 0/365 km 0/391 km to 0/431 km .)
S/r to road from subhas bose square to acharya harihar square for the year 2026-27. (such as restoration of damaged b.t portion of road due to heavy rainfall in patches from ch.0/000 km to 0/036 km,0/343 to 0/365 km 0/391 km to 0/431 km .)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type