Tender Details
Particulars | Details |
---|---|
Title |
Constucting Closed Pipeline Of 350 M Length In Km 03 From Chainage 2470 M To 2820 M On Sule Right Bank Canal Of Punad Major Project, Tal.Kalwan, Dist . Nashik.
|
Description |
Constucting Closed Pipeline Of 350 M Length In Km 03 From Chainage 2470 M To 2820 M On Sule Right Bank Canal Of Punad Major Project, Tal.Kalwan, Dist . Nashik.
|
Organisation | Government of Maharashtra |
Tender Id | 2023_TIDC_976735_1 |
Reference Number |
E- Tender Notice No.10For 2023-24 |
Tender Fee | 2360 |
EMD | 1.43 Lakh |
Tender Value | |
Place | Executive Engineer Girna River Valley Project Divi |
Link | https://mahatenders.gov.in |
Start Date | January 01, 2024 16:30 |
End Date |
15/01/2024 ( Expired 462 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km
 47.700 (design chainage(tupudana to
 kundibartoli) in the state of jharkhand
 (total length 31.300 km) on hybrid annuity
 mode.
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreConstr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Constr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Read moreUpgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Upgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreIndependent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreConstruction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham
Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham
Read moreUpgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read moreof your Industry type