Tender Details

Particulars Details
Title
Restoration Of Road Cut After Laying Water Supply Pipe Line On Link Road Ghnaour Phirni (Part B) District Patiala
Description
Restoration Of Road Cut After Laying Water Supply Pipe Line On Link Road Ghnaour Phirni (Part B) District Patiala
Organisation CE-PWD(B and R) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 8530
EMD 60000
Tender Value
Place Ghanour
Link

AAAAAAAAAA

Login to view
Start Date June 23, 2025 23:45
End Date

30/06/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Read more
Water supply scheme for augmentation of uwss kota-north, district kota including 05 years o and m after 01 year of defect liability period under amrut 2.0

Water supply scheme for augmentation of uwss kota-north, district kota including 05 years o and m after 01 year of defect liability period under amrut 2.0

Read more
Construction of toilet including (link road between main building and toilet block) with roofing internal water supply and sanitary installation for transgender at kamalpur court building kamalpur dhalai tripura during the year 2025-26

Construction of toilet including (link road between main building and toilet block) with roofing internal water supply and sanitary installation for transgender at kamalpur court building kamalpur dhalai tripura during the year 2025-26

Read more
Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a

Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a

Read more
Repair/ maint of rising main, ci, di and gi pipe line and other connected works to water supply system under ge (af) tech area agra

Repair/ maint of rising main, ci, di and gi pipe line and other connected works to water supply system under ge (af) tech area agra

Read more
Repairs / rectification of day-to-day complaints of external water supply system including repairs/ replacement of ci/ di/ gi / ppr pipe line network, sluice valves, valve pit chambers and connected works at div unit area, meadows line, safilguda pkt

Repairs / rectification of day-to-day complaints of external water supply system including repairs/ replacement of ci/ di/ gi / ppr pipe line network, sluice valves, valve pit chambers and connected works at div unit area, meadows line, safilguda pkt

Read more
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu

Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu

Read more
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu

Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu

Read more
Interal devlopment work inpart of pocket c and b of lalpur awasiya yajna such as laying of dbm and bc other road and interlocking tiles on both the tracks

Interal devlopment work inpart of pocket c and b of lalpur awasiya yajna such as laying of dbm and bc other road and interlocking tiles on both the tracks

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise