| Particulars | Details |
|---|---|
| Title |
Thin White Topping Work On Airport Approach Rd, Bhopal Length 0.70 (Four Lane), State Hanger N Old Terminal Approach Rd N State Hanger Parking, Bhopal Length 3.00 K.M. (Two Lane), D.I.G. Bunglow To Best Prize (Ayodhya Bypass Rd ) Via Kalipared Rd
|
| Description |
Thin White Topping Work On Airport Approach Rd, Bhopal Length 0.70 (Four Lane), State Hanger N Old Terminal Approach Rd N State Hanger Parking, Bhopal Length 3.00 K.M. (Two Lane), D.I.G. Bunglow To Best Prize (Ayodhya Bypass Rd ) Via Kalipared Rd
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2024_PWDRB_371899_1 |
|
Reference Number |
19/ G. /1/Mis/C.Z./2019 (Year 2024) |
| Tender Fee | 51180 |
| EMD | 10.37 Lakh |
| Tender Value | - |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=438097 |
| Start Date | September 27, 2024 16:00 |
| End Date |
Expired
11/10/2024
Expired 734 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Constr of 05 caverns, each 63.5m in length, comprising 40m main cavern and 23.5m approach cavern with portal, including 4m x 7.5m niches/ living rooms on both sides of the approach cavern with the approach road connecting to existing rd at
General karzok under project himank in ladakh ut on epc mode
Read morePmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Read moreConsultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Read moreConsultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Read moreConstruction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Construction of balance work of 165.00 mtr span double lane bridge on nahan dadahu haripurdhar road at rd 35/690.(sh c/o of approach road along with m/t) under crf (job no. crf-hp-2018-19-155)
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreMaintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)
Maintenance of bhopal bypass road length 26 km (2 lane) in total length of 52 km (4 lane)
Read moreBt renewal work of silwani sagar road to govt primary health center sultanganj approach road silwani length 0.70 km.
Bt renewal work of silwani sagar road to govt primary health center sultanganj approach road silwani length 0.70 km.
Read moreB.t. renewal work of rest house approach kareli and tendukheda road length 0.70 k.m. under sub. division narsinghpur. (6th call)
B.t. renewal work of rest house approach kareli and tendukheda road length 0.70 k.m. under sub. division narsinghpur. (6th call)
Read moreB.t. renewal of internal 1100 qtr. approach road length 5.70 km and tulsi nagar approach road length 1.48 km and other work under m-3 sub dn ,new bhopal division,pwd bhopal
B.t. renewal of internal 1100 qtr. approach road length 5.70 km and tulsi nagar approach road length 1.48 km and other work under m-3 sub dn ,new bhopal division,pwd bhopal