Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
3.5 Hp Petrol Engine (Power Unit) For Hydraulic Rescue Tools
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/4225237 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | December 04, 2023 21:02 |
| End Date |
Expired
25/12/2023
Expired 997 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | NEOMETRIX DEFENCE LIMITED | Make : NEOMETRIX Model : A-7397-3.5 HP PETROL ENGINE (POWER UNIT) Title : 3.5 HP PETROL ENGINE (POWER UNIT) FOR HYDRAULIC RESCUE TOOLS | 25-12-2023 09:13:33 | Registered with designated Agency / Authority | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | NEOMETRIX ENGINEERING PRIVATE LIMITED(MSE,MII) | Item Categories : 3.5 HP PETROL ENGINE (POWER UNIT) FOR HYDRAULIC RESCUE TOOLS | 1003000.00 | L1 |
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreEngaging of 02nos. back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler 1 and 2, track hopper 1a and 1b grids and at contingency arrangement 1 and 2 on round the clock basis for arranging uninterrupted coal feeding for a period of one year from the actual date of commencement of work
Engaging of 02nos. back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler 1 and 2, track hopper 1a and 1b grids and at contingency arrangement 1 and 2 on round the clock basis for arranging uninterrupted coal feeding for a period of one year from the actual date of commencement of work
Read moreof your Industry type