Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Socio Economic Survey Related To Environmental Clearance Of Proposed 2x660 Mw Extension Tpp Unit 7 And 8 At Chhabra Tps Distt. Baran Coal Based Ultra Supercritical Thermal Power Project.
|
| Description |
Socio Economic Survey Related To Environmental Clearance Of Proposed 2x660 Mw Extension Tpp Unit 7 And 8 At Chhabra Tps Distt. Baran Coal Based Ultra Supercritical Thermal Power Project.
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_32329_1 |
|
Reference Number |
BHEL/HEEP/WCS/5599/202304111 |
| Tender Fee | 0 |
| EMD | 10400 |
| Tender Value | - |
| Place | Chhabra, Baran |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=33793 |
| Start Date | January 27, 2024 18:30 |
| End Date |
Expired
06/02/2024
Expired 980 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engaging agency for carrying out environment impact assessment and environment management plan (ela/emp) studies for the proposed 1x800mw coal based ultra supercritical unit at panipat thermal power station (ptps), panipat for obtaining environmental
Engaging agency for carrying out environment impact assessment and environment management plan (ela/emp) studies for the proposed 1x800mw coal based ultra supercritical unit at panipat thermal power station (ptps), panipat for obtaining environmental
Read moreAsh disposal and utilization study related to environmental clearance of proposed 2x660 mw chhabra (extension) coal based supercritical thermal power project.
Ash disposal and utilization study related to environmental clearance of proposed 2x660 mw chhabra (extension) coal based supercritical thermal power project.
Read moreEngagement of consultant for socio-economic study and environmental impact assessment of fuel - blending in coal-fired tpp
Engagement of consultant for socio-economic study and environmental impact assessment of fuel - blending in coal-fired tpp
Read moreInclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Inclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Read moreEpc package for supply and installation of 2x300 cubic meter/ hr capacity ro (reverse osmosis) plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units-5 and 6 supercritical tpp, csctpp, chhabra, baran
Epc package for supply and installation of 2x300 cubic meter/ hr capacity ro (reverse osmosis) plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units-5 and 6 supercritical tpp, csctpp, chhabra, baran
Read moreInclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Inclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Read moreStudies related to environmental clearance of proposed 2 x 660 mw chhabra extension coal based supercritical thermal power project i.e. area-drainage study geotechnical survey hydrographical study topographic survey.
Studies related to environmental clearance of proposed 2 x 660 mw chhabra extension coal based supercritical thermal power project i.e. area-drainage study geotechnical survey hydrographical study topographic survey.
Read moreAnnual contract for rbc maintenance and operation of various air conditioning systems evaporative cooling systems window or split ac water coolers and refrigerators installed at 2x660 mw csctpp chhabra and supercritical field hostel in ctpp township.
Annual contract for rbc maintenance and operation of various air conditioning systems evaporative cooling systems window or split ac water coolers and refrigerators installed at 2x660 mw csctpp chhabra and supercritical field hostel in ctpp township.
Read moreof your Industry type