🏭 Epc Tender For 2x300 Cubic Meter/ Hr Ro Plant At Chhabra Baran 💧 Rrvun Cmd, On Behalf Of The State Government And Union Territories, Invites Tenders For The Epc Package To Supply And Install A 2x300 Cubic Meter/ Hour Capacity Reverse Osmosis (Ro) Plant At The 2x660 Mw Units 5 And 6 Supercritical Tpp, Csctpp, Chhabra, Baran, Rajasthan. 📅 Tender Submission Deadline: April 29, 2024, 2:00 Pm Tender Fee: Inr 14,750 Earnest Money Deposit (Emd): Inr 17,60,000 This Project Is Aimed At Enhancing The Zero Liquid Discharge (Zld) Capabilities Of The Thermal Power Plant To Treat Plant Effluent Water For Reuse, In Line With Environmental Regulations. Interested Bidders Must Possess The Necessary Technical And Financial Capabilities To Execute Such A Project. Detailed Proposals, Including Technical Specifications, Pricing, And Implementation Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Epc Tender, Reverse Osmosis Plant, Zero Liquid Discharge, Rrvun Cmd, Thermal Power Plant, Chhabra Baran, Rajasthan, Environmental Compliance, State Govt. And Ut TenderParticulars | Details |
---|---|
Title |
Epc Package For Supply And Installation Of 2x300 Cubic Meter/ Hr Capacity Ro (Reverse Osmosis) Plant For Treatment Of Plant Effluent Water For Plant Reuse To Comply Zld Requirement At 2x660 Mw Units 5 And 6 Supercritical Tpp, Csctpp, Chhabra, Baran
|
Description |
Epc Package For Supply And Installation Of 2x300 Cubic Meter/ Hr Capacity Ro (Reverse Osmosis) Plant For Treatment Of Plant Effluent Water For Plant Reuse To Comply Zld Requirement At 2x660 Mw Units 5 And 6 Supercritical Tpp, Csctpp, Chhabra, Baran
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_381513_1 |
Reference Number |
TN-18/2023-24 |
Tender Fee | 14750 |
EMD | 1.76 Crore |
Tender Value | |
Place | Chhabra Baran, Rajasthan |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=679314 |
Start Date | February 16, 2024 00:25 |
End Date |
13/05/2024 ( Expired 373 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, manufacture, supply, foundation, installation, testing, commissioning, and proving out of fully automatic coach washing plant along with water softening plant, reverse osmosis (ro) plant and effluent treatment plant (etp) cum water recycling plant and dg on turnkey basis inclusive of civil work and comprehensive maintenance and operation contract for two years in warranty period from the date of commissioning at coach care complex jaipur.
For complete deion and other details, please refer to tender
Read moreDesign, manufacture, supply, foundation, installation, testing, commissioning, and proving out of fully automatic coach washing plant along with water softening plant, reverse osmosis (ro) plant and effluent treatment plant (etp) cum water recycling plant and dg on turnkey basis inclusive of civil work and comprehensive maintenance and operation contract for two years during warranty period from the date of successful proving out test (ptc) and operation and maintenance for 03 years after
For complete deion and other details, please refer to tender
Read moreDesign, manufacture, supply, foundation, installation, testing, commissioning, and proving out of fully automatic coach washing plant along with water softening plant, reverse osmosis (ro) plant and effluent treatment plant (etp) cum water recycling plant and dg on turnkey basis inclusive of civil work and comprehensive maintenance and operation contract for two years in warranty period from the date of commissioning at coach care complex jaipur.
For complete deion and other details, please refer to tender
Read moreDesign supply ,installation and commissioning of fully automatic coach washing plant along with reverse osmosis (ro) plant and effluent treatment plant (etp) cum water recycling plant, on turnkey basis inclusive of foundation related civil work and maintenance and operation for two years in warranty period from the date of commissioning
For complete deion and other details, please refer to tender
Read moreEpc package for supply and installation of 2x300 cubic meter/ hr capacity ro (reverse osmosis) plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units-5 and 6 supercritical tpp, csctpp, chhabra, baran
Epc package for supply and installation of 2x300 cubic meter/ hr capacity ro (reverse osmosis) plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units-5 and 6 supercritical tpp, csctpp, chhabra, baran
Read moreInclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Inclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Read moreInclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Inclusion of ro (reverse osmosis plant) before sac in existing dm plant to achieve desired dm water quality parameters along-with one year o and m at 2x660mw units_5_6 supercritical tpp, csctpp, chhabra, baran against nit no. 09/2023-24
Read moreFurnishing detailed technical proposal with cost estimate for installation of 2x300cubic m/ hr capacity ro plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units5_6, chhabra csctpp against tn-11/2023-24
Furnishing detailed technical proposal with cost estimate for installation of 2x300cubic m/ hr capacity ro plant for treatment of plant effluent water for plant reuse to comply zld requirement at 2x660mw units5_6, chhabra csctpp against tn-11/2023-24
Read moreEoi for technical proposal with cost estimate for inclusion of ro (reverse osmosis plant) before sac in existing dm plant of capacity 3x65 m3/hr to achieve desired dm water quality parameters at 2x660mw units-5 and 6 csctpp chhabra baran, raj
Eoi for technical proposal with cost estimate for inclusion of ro (reverse osmosis plant) before sac in existing dm plant of capacity 3x65 m3/hr to achieve desired dm water quality parameters at 2x660mw units-5 and 6 csctpp chhabra baran, raj
Read moreof your Industry type