Tender Details

Particulars Details
Title
Strengthening Of Road From (I) Bahadurdih To Eklabyapur (L 1.460 Km.), (Ii) Husumnagar To Ghormara (L 3.500 Km.), (Iii) Siyarketiya To Fatehpur (L 2.150 Km.), (Iv) Chak Nayapara To Jivanpur (L 1.100 Km.), (V) Dalabar To Suriyapani (L 2.450 Km.)
Description
Strengthening Of Road From (I) Bahadurdih To Eklabyapur (L 1.460 Km.), (Ii) Husumnagar To Ghormara (L 3.500 Km.), (Iii) Siyarketiya To Fatehpur (L 2.150 Km.), (Iv) Chak Nayapara To Jivanpur (L 1.100 Km.), (V) Dalabar To Suriyapani (L 2.450 Km.)
Organisation RWD EinC | State Govt. and UT
Tender Id 2024_RWD_90307_1
Reference
Number
RWD/JAMTARA/STPKG-06/RI/24-25
Tender Fee 10000
EMD 23.94 Lakh
Tender Value
Place NALA
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=121918
Start Date August 16, 2024 17:00
End Date

22/08/2024 ( Expired 300 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Read more
Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50

Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Read more
Improvement of link road from horna hordoo to wasser via malikpora by way of grade ii, grade- ii, 50 mm bm and 25 mm sdbc l1.20 km

Improvement of link road from horna hordoo to wasser via malikpora by way of grade ii, grade- ii, 50 mm bm and 25 mm sdbc l1.20 km

Read more
Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr

Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr

Read more
Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan

Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise