Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of 35 Mtr Span Maj Pmt Bridge Lingdong Bridge Psc Box Girder Type Superstructure On Open Foundation Including Ssi And Approaches Over Ribim Chu Nallah At Km 19.75 On Dikchu Sanklang Road Under 107 Rcc/758 Tf (P) Swastik In Si
|
Description |
Design And Construction Of 35 Mtr Span Maj Pmt Bridge Lingdong Bridge Psc Box Girder Type Superstructure On Open Foundation Including Ssi And Approaches Over Ribim Chu Nallah At Km 19.75 On Dikchu Sanklang Road Under 107 Rcc/758 Tf (P) Swastik In Si
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2024_BRO_666781_1 |
Reference Number |
80573R |
Tender Fee | 0 |
EMD | 6.09 Lakh |
Tender Value | |
Place | AT KM 19.75 ON DIKCHU SANKLANG ROAD |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=745639 |
Start Date | July 24, 2024 14:30 |
End Date |
09/08/2024 ( Expired 275 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Design constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreDesign and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreDesign and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)
Design and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreDsgn, drwg and constr of pmt brs/mcbc on road mtns under (p) sewak in manipur state. part-a 75 mtr br with steel s/str at km 1.310 (part b) (i-ii) 35 mtr pmt br with psc box girder at km 15.92 and km 18.14 (iii) 40.80 mtr mcbc at km 10.84
Dsgn, drwg and constr of pmt brs/mcbc on road mtns under (p) sewak in manipur state. part-a 75 mtr br with steel s/str at km 1.310 (part b) (i-ii) 35 mtr pmt br with psc box girder at km 15.92 and km 18.14 (iii) 40.80 mtr mcbc at km 10.84
Read moreConstruction of 19.75 mtrs span rcc box girder bridge over lal ghar nallah at rd 3/450 and 40.00 mtrs. span bridge over manjhi khad at rd 5/035 on samber lahar to thathri road km 0/000 to 6/082 under pmgsy -iii
Package no. hp-04-441 missing bridge in distt. kangra h.p sh-geo technical investigation
Read moreDesign and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode
Design and construction of pmt psc box girder bridge at km 11.200 shaniyal 120 m span along with its approaches ssi, proof checking from iit on dayalachak ramkot rd under project sampark in jk (ut) through epc mode
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreof your Industry type