Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Boosting System Water Tank And Allied Work In (Judges Houses) Sector 4 And 5 Ut Chandigarh (Ch. To 2216 (Np) Mtc. And Repair)
|
Description |
Construction Of Boosting System Water Tank And Allied Work In (Judges Houses) Sector 4 And 5 Ut Chandigarh (Ch. To 2216 (Np) Mtc. And Repair)
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2025_CHD_85136_1 |
Reference Number |
PH3/2025/75 |
Tender Fee | 0 |
EMD | 9632 |
Tender Value | |
Place | CHANDIAGRH |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=104792 |
Start Date | March 24, 2025 18:30 |
End Date |
02/04/2025 ( Expired 19 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreConstruction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Construction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreConstruction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Construction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Read moreConstruction of dome type rcc water storage tank of capacity 2 lakhs ltr to fulfill water demand of link sadan, suket sadan, officer club and model school near model school bbmb sundernagar.
Construction of dome type rcc water storage tank of capacity 2 lakhs ltr to fulfill water demand of link sadan, suket sadan, officer club and model school near model school bbmb sundernagar.
Read morePreparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreof your Industry type