Tender Details

Particulars Details
Title
Construction Of Protection Wall Gabin Wall Near Residential Area Along The Service Road At Deep Canal Km 151 Of Arphal Main Canal At Visapur Tal Tasgaon Dist. Sangli
Description
Construction Of Protection Wall Gabin Wall Near Residential Area Along The Service Road At Deep Canal Km 151 Of Arphal Main Canal At Visapur Tal Tasgaon Dist. Sangli
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2025_CWRDP_1145087_1
Reference
Number
2025 Arphal Visapur
Tender Fee 2860
EMD 17000
Tender Value
Place Visapur
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1993840
Start Date February 03, 2025 16:00
End Date

10/02/2025 ( Expired 125 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd

Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Construction of r.c.c. wall at green belt area from khajrana square to bangali square (both side) service road under garden civil department (h.q.).

Construction of r.c.c. wall at green belt area from khajrana square to bangali square (both side) service road under garden civil department (h.q.).

Read more
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).

Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).

Read more
Construction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)

Construction of rrc wall at service road green belt area from malviya petrol pump to robot square (both side) under garden civil department (h.q.)

Read more
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Read more
Construction of protection wall along with rcc slab culvert across the oulgaret pallavoikkal at first main road in thirumalaithayar nagar (phase-ii) in oulgaret revenue village, puducherry.

Construction of protection wall along with rcc slab culvert across the oulgaret pallavoikkal at first main road in thirumalaithayar nagar (phase-ii) in oulgaret revenue village, puducherry.

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise