Tender Details

Particulars Details
Title
Ttps Mech Ii Bm Unit I Ii Iii Cleaning Of Zero Meter Floor In Between Bah Mill And Disposal Of Fly Ash Debris Etc From To Debris Yard For The Period From 01042025 To 31 03 2026
Description
Ttps Mech Ii Bm Unit I Ii Iii Cleaning Of Zero Meter Floor In Between Bah Mill And Disposal Of Fly Ash Debris Etc From To Debris Yard For The Period From 01042025 To 31 03 2026
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_525335_1
Reference
Number
CE/TTPS/SE/M-II/No.27/2025-26
Tender Fee 0
EMD 6200
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625429
Start Date February 17, 2025 15:30
End Date

04/03/2025 ( Expired 127 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps es circle em i cleaning of fly ash and coal dust in the cable cable trays in and around unit iii tg area from mc pump area to tg floor area during o h 2025 2026

Ttps es circle em i cleaning of fly ash and coal dust in the cable cable trays in and around unit iii tg area from mc pump area to tg floor area during o h 2025 2026

Read more
Ttps mech ii ahp painting of unit iii bottom ash hopper plate and its connected structural supports from 0mtr to 6 mtr el during annual overhaul 2025 26

Ttps mech ii ahp painting of unit iii bottom ash hopper plate and its connected structural supports from 0mtr to 6 mtr el during annual overhaul 2025 26

Read more
Ttps mech ii ahp replacing the clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly etc in unit iii bottom ash hopper ash disposal system during annual overhaul 2025 26

Ttps mech ii ahp replacing the clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly etc in unit iii bottom ash hopper ash disposal system during annual overhaul 2025 26

Read more
Ttps mech ii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2025 26

Ttps mech ii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2025 26

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Read more
Prive breakdown maintenance work of 220 132 kv switch yard and its related area of grid sub station madanpur dumka for the period from 01 07 2025 to 31 03 2026

Prive breakdown maintenance work of 220 132 kv switch yard and its related area of grid sub station madanpur dumka for the period from 01 07 2025 to 31 03 2026

Read more
Cleaning with loading, unloading of coal, coaldust, rejection coal, etc. and transportation of same from mill areas of unit5 and 6 including trenches, etc. inside plant premises to the disposal yard of stps

Cleaning with loading, unloading of coal, coaldust, rejection coal, etc. and transportation of same from mill areas of unit5 and 6 including trenches, etc. inside plant premises to the disposal yard of stps

Read more
Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler

Ttps mech ii bm unit iii strengthening of weak welding joints of step grills platform grills and renewal of damaged corroded structurals from 0 mtr to 52 mtr elevation of unit iii boiler

Read more
Nctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026

Nctpsi semii circle ahp dn breakdown routine maintenance of recovery water line no2 and 3 having od 356 362 mm from recovery water pump house to ash handling pump house for a period from the handing over of site to 31 03 2026

Read more
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026

Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &amp#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &amp#x0d days from 28 05 2025 to 31 03 2026&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise