Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Tender Announcement For Ttps Mech Ii Ahp Plastering Services 🏭 Tneb Limited, A State Government Undertaking, Is Seeking Tenders For Specialized Services Related To The Annual Overhaul Of Unit Iii Bah For The 2024 2025 Period. The Scope Of Work Includes The Plastering Of Refractory Cement Inside The Bah And The Removal Of Ash Slag And Debris From The Bah Floor And Trenches. 📅 Submission Deadline: July 18, 2024, 2:00 Pm A Tender Security Amount Of Inr 32,000 Must Be Submitted With The Tender Application. No Tender Fee Is Payable. Interested Contractors Must Possess The Necessary Expertise And Equipment To Perform These Services, Ensuring Compliance With All Safety And Quality Standards. Keywords: Tneb Limited, Ttps Mech Ii Ahp, Plastering, Refractory Cement, Ash Slag Removal, Annual Overhaul, State Govt. And Ut Tender| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Ahp Plastering Of Refractory Cement Inside Unit Iii Bah And Removal Of Ash Slag And Debris From Bah Floor And Trenches During Annual Overhaul 2024 2025
|
| Description |
Ttps Mech Ii Ahp Plastering Of Refractory Cement Inside Unit Iii Bah And Removal Of Ash Slag And Debris From Bah Floor And Trenches During Annual Overhaul 2024 2025
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_459487_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.292/2024-25 |
| Tender Fee | 0 |
| EMD | 3200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546173 |
| Start Date | July 03, 2024 19:30 |
| End Date |
Expired
18/07/2024
Expired 819 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Ttps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Read moreTtps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Read moreTtps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreTtps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Read moreTtps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Read moreTtps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Read moreTtps mech ii bm unit v replacement of worn out supports of eco hoppers during overhaul for the year 2026 2027
Ttps mech ii bm unit v replacement of worn out supports of eco hoppers during overhaul for the year 2026 2027
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreof your Industry type