Tender Details

About Tender

🏭 Tender Announcement For Ttps Mech Ii Ahp Plastering Services 🏭 Tneb Limited, A State Government Undertaking, Is Seeking Tenders For Specialized Services Related To The Annual Overhaul Of Unit Iii Bah For The 2024 2025 Period. The Scope Of Work Includes The Plastering Of Refractory Cement Inside The Bah And The Removal Of Ash Slag And Debris From The Bah Floor And Trenches. 📅 Submission Deadline: July 18, 2024, 2:00 Pm A Tender Security Amount Of Inr 32,000 Must Be Submitted With The Tender Application. No Tender Fee Is Payable. Interested Contractors Must Possess The Necessary Expertise And Equipment To Perform These Services, Ensuring Compliance With All Safety And Quality Standards. Keywords: Tneb Limited, Ttps Mech Ii Ahp, Plastering, Refractory Cement, Ash Slag Removal, Annual Overhaul, State Govt. And Ut Tender
Particulars Details
Title
Ttps Mech Ii Ahp Plastering Of Refractory Cement Inside Unit Iii Bah And Removal Of Ash Slag And Debris From Bah Floor And Trenches During Annual Overhaul 2024 2025
Description
Ttps Mech Ii Ahp Plastering Of Refractory Cement Inside Unit Iii Bah And Removal Of Ash Slag And Debris From Bah Floor And Trenches During Annual Overhaul 2024 2025
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_459487_1
Reference
Number
CE/TTPS/SE/M-II/No.292/2024-25
Tender Fee 0
EMD 3200
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546173
Start Date July 03, 2024 19:30
End Date

18/07/2024 ( Expired 348 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Insulation, refractory , removal of fly ash, debris from pressure part, ducts, hoppers , roof of penthouse etc. including insulation of id,fd,pa fans , mills of all the seven units of all three stages (a, b, d tps) of anpara during breakdown.

Insulation, refractory , removal of fly ash, debris from pressure part, ducts, hoppers , roof of penthouse etc. including insulation of id,fd,pa fans , mills of all the seven units of all three stages (a, b, d tps) of anpara during breakdown.

Read more
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v

Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v

Read more
Ttps mech ii ahp erection of 200 nb ss316 gr sch 80 seamless pipes along with fittings of unit iii seal water lines taken from stage iii filtered over head tank

Ttps mech ii ahp erection of 200 nb ss316 gr sch 80 seamless pipes along with fittings of unit iii seal water lines taken from stage iii filtered over head tank

Read more
Insulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-03, 3x210 m.w., atps, anpara

Insulation, refractory and removal of fly ash, debris from &amp#x0d pressure part, ducts, hoppers and roof of pent house etc. during &amp#x0d overhauling of unit-03, 3x210 m.w., atps, anpara

Read more
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot

Read more
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Read more
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system

Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system

Read more
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Read more
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul

Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul

Read more
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul

Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise