Tender Details
Particulars | Details |
---|---|
Title |
Nhidcl/Jk/Dpr/Khellani Khanabal/P Kg Vi/ Intermittentstretches
|
Description |
Consultancy Services For Preparation Of Dpr For Intermittent 2 Lane With Ps Stretches To 4 Lane In Between Design Km 148.589 (Vailoo) To Design Km 176.532 (Donipawa) Of 8.643 Km Length On Khellani Khanabal Section Of Nh 244 In The Ut Of Jk
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2024_NHIDC_788931_1 |
Reference Number |
NHIDCL/JK/DPR/Khellani- Khanabal/Pkg-VI |
Tender Fee | 5900 |
EMD | 2 Lakh |
Tender Value | 0 |
Place | Anantnag, UT of JK |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829243 |
Start Date | February 12, 2024 16:30 |
End Date |
05/03/2024 ( Expired 436 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nhidcl/jk/ z-morhtunnel/ie/2024

 consultancy services as independent engineer during operation and maintenance of sonamarg tunnel including approaches on srinagar sonamarg section connecting national highway no. 1 in the ut of jk on dbfot annuity basis
Read moreNhidcl/sikkim/dpr/pakyong/2025
Consultancy services for preparation of dpr and pre-const. activities in respect ofconstruction of existing carriageway into 2l withps from pakyong tobarapathing via gangchung , tokchi and machong in the state ofsikkim (2nd call)
Read moreNhidcl/sikkim/dpr/510/singtam /25
Consultancy services for preparation of dpr for major bridge connecting nh-10 with nh-510, realignment from ch. 0 to ch. 3.074 on nh-510 into 2lps and permanent mitigation measures on sinking sliding zones 2nd call
Read moreNhidcl/megh./s-d (pkg-iii)/pynursla bypass/ae/2025
Consultancy services of authority engineer for improvement construction to 2-lane with paved shoulder of old nh-40 new nh-206 from km 37.550 to km 45.760 design km 0.000 to km 7.760, package-iii pynursla bypass on epc mode
Read moreNhidcl/ro imphal/nh 37/i j/ pkg 1/2025/
Maintenance of existing road section from design chainage km 3.275 to km 15.940 total length 12.665 pkg i of nh 37 in the state of manipur on item rate and work order basis to be carried out at the risk and cost of the epc contractor
Read moreBandr/71139/mech work/pkg-vi/nit/sc/07
Carrying out mechanical works fabrication and erection of piping and associated works for iocl gujarat refinery vadodara
Read moreNhidcl/hq/wb/pkg-ivc/2025
Slope protection work of bagrakote kafer section from km. 25.600 to km. 26.100 on nh - 717a in west bengal on epc mode pkg-ivc
Read moreNhidcl/assam/nh-37/s-j/ pkg-ii-part(1)/245930
4-laning of silchar (near budha nagar) at existing km 233.000 (d. ch.24.560) to jiribam at existing km 212.060 (d. ch. 37.650) of nh-37 (length 13.09 km) in the state of assam and manipur under nh(o)-ne on hybrid annuity mode (ham) (pkg-2)
Read moreNhidcl/manipur/c-t/pkg-4a/2020
Balance work of widening to 2 (two) lane with hard shoulder of churachandpur to tuivai section of nh-102b from design chainage km 118.850 to km 132.037 (package 4a) in the state of manipur on epc mode
Read moreNhidcl/manipur/c-t/pkg-4b/2020
Balance work of widening to 2 (two) lane with hard shoulder of
 churachandpur to tuivai section of nh-102b from km 130.000 to km 141.029 (package-
 4b) in the state of manipur on epc mode
Read moreof your Industry type