Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil Resistivity Survey At Mdpl Mundra,Additional Soil Resistivity Testing At Mdpl Mundra,Chemical
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5362396 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 05, 2024 18:02 |
| End Date |
Expired
16/09/2024
Expired 756 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | AIMN PROJECTS PRIVATE LIMITED | - | 16-09-2024 12:25:53 | MSE | MSE | Disqualified |
| 2 | ELECTRO CORR DAMP PRIVATE LIMITED | - | 16-09-2024 16:15:18 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | GLOBAL TESTING AND RESEARCH LABORATORY | - | 14-09-2024 16:36:57 | Registered with designated Agency / Authority | MSE | Disqualified |
| 4 | HRP INFRA PRIVATE LIMITED | - | 14-09-2024 18:53:23 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 5 | M/S KARENG CONSTRUCTION & CIVIL ENGINEERING CONSULTANCY | - | 15-09-2024 06:46:21 | Registered with designated Agency / Authority | MSE | Disqualified |
| 6 | MNEC CONSULTANTS PRIVATE LIMITED | - | 15-09-2024 18:07:24 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 7 | SARK EPC PROJECTS PRIVATE LIMITED | - | 19-09-2024 11:25:27 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 8 | VSSAN INSTRUMENTS PRIVATE LIMITED | - | 15-09-2024 15:00:08 | Registered with designated Agency / Authority | MSE | Disqualified |
| 9 | WEST INDIA CONSULTANCY SERVICES | - | 18-09-2024 16:48:44 | MSE | MSE | Disqualified |
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreEstimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSoil resistivity survey at mdpl mundra,additional soil resistivity testing at mdpl mundra,chemical
Read more
Soil investigation surveys,soil resistivity survey,detailed route survey,cadastral survey,permissio
Read more
of your Industry type