Tender Details

About Tender

🚂 Procurement Notice: Bracket For Anchor Link On Bogie Frame 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Issuing A Procurement Notice For The Supply Of Brackets For Anchor Links On Bogie Frames. This Is In Accordance With The Technical Specifications And Detailed Drawings As Outlined In The Tender Document. 📅 Submission Deadline: June 27, 2024, 2:30 Pm Interested Vendors Must Submit Their Bids By The Specified Deadline, Ensuring All Technical And Financial Requirements Are Met. Bids Should Be In Compliance With The Tender Conditions And Should Be Accompanied By All Necessary Documentation. Keywords: Bracket, Anchor Link, Bogie Frame, Icf T 0 3 635, Ministry Of Railways, Tender, Procurement, Railway Equipment
Particulars Details
Title
Bracket For Anchor Link On Bogie Frame To Drg. No. Icf T 0 3 635 Alt L(small L)/16 Item No. 1, 2 & 3.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106368098
Reference
Number
LS245306
Tender Fee 0
EMD 0
Tender Value
Place Secunderabad
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106368098/viewNitPdf_4596562.pdf
Start Date June 06, 2024 15:44
End Date

27/06/2024 ( Expired 348 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia panki site-3, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement.

Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia panki site-3, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Read more
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia panki site-2, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia panki site-2, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Read more
Providing of 93 no. out sourced personnel i.e.21 no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/ watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru

Providing of 93 no. out sourced personnel i.e. 21no. skilled technical assistants, 6 no. skilled drivers, 40 no. skilled data entry operators, 8 no. semi skilled receipt despatch assistants, 16 no. un-skilled security/watch ward and 2 no. unskilled attenders for the period of 21 months i.e. from 01.07.2025 to 31.03.2027 on works contract basis at various places in operation circle, eluru

Read more
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia rooma, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia rooma, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Read more
(a) improvements to nathavaram to eg districts limits rb road 0/4km r/s to chammachintha-sarugudu rb road at 6/0 km l/s via gummidigonda from km 0/0 to 4/500 (b)kailasapatnam giduturu road from km 0/0 to 9/6. (c) narsipatnam-devipatnam sh 4/2 km r/s (cheedigummala) to p.g.peta via pakalapadu from km 0/0 to 5/100. (d) narsipatnam-devipatnam sh 26/4 km l/s (a.l.puram) to konkasingi from km 1/0 to 3/100 in anakapalli dist

(a) improvements to nathavaram to eg districts limits rb road 0/4km r/s to chammachintha- sarugudu rb road at 6/0 km l/s via gummidigonda from km 0/0 to 4/500 (b)kailasapatnam giduturu road from km 0/0 to 9/6. (c) narsipatnam-devipatnam sh 4/2 km r/s (cheedigummala) to p.g.peta via pakalapadu from km 0/0 to 5/100. (d) narsipatnam-devipatnam sh 26/4 km l/s (a.l.puram) to konkasingi from km 1/0 to 3/100 in anakapalli district

Read more
Sopd_g_25_26_01 improvement of (1) agchia to deochar road, (2) bihdia to e and d bundh, (3) nh-17 to ratanpur, (4) nh-17 to gumi, (5) pwd road to deochar, (6) p l road via natco farma ltd. and construction of rcc drain, (7) 10 nos. link roads from na

Sopd_g_25_26_01 improvement of (1) agchia to deochar road, (2) bihdia to e and d bundh, (3) nh-17 to ratanpur, (4) nh-17 to gumi, (5) pwd road to deochar, (6) p l road via natco farma ltd. and construction of rcc drain, (7) 10 nos. link roads from na

Read more
Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e. link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.1

Annual maintenance plan-i for the year 2025-26 on thatharna to thanga i.e. link road to village devna km. 0/0 to 3/130 vr (non pmgsy)(sh repair of pot holes and bitumenous concrete 25 mm thick using plastic based from km. 2/00 to 3/130 ) 1.1

Read more
Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida i.a. partapur and udhyog puram meerut on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Selection of contractor to implement integrated s.w.m. services on o/m basis of upsida ia partapur and udhyog puram&amp#x0d meerut on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years(1 year at a time on mutual agreement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise