Tender Details

Particulars Details
Title
Consultancy Services For Preparation Of Dpr For Widening To 2 Lane Configuration Of Nh 309 B (Almora Panar) Including Connectivity To Proposed Almora Bypass On Nh 87 Ext. In The State Of Uttarakhand.
Description
Consultancy Services For Preparation Of Dpr For Widening To 2 Lane Configuration Of Nh 309 B (Almora Panar) Including Connectivity To Proposed Almora Bypass On Nh 87 Ext. In The State Of Uttarakhand.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2023_MoRTH_784251_1
Reference
Number
-
Tender Fee 5000
EMD 0
Tender Value 0
Place Almora-Panar NH-309B
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=824393

Start Date December 12, 2023 22:30
End Date
Expired 29/01/2024

Expired 993 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for construction of 2-lane joshimath bypass by exploring utilisation of the alignment of the foreclosed joshimath bypass project along with alternat

Construction of 2-lane joshimath bypass by exploring utilisation of the alignment of the foreclosed joshimath bypass project along with alternate alignment options from km 465.000 to km 472.000 of nh-07 in the state of uttarakhand.(length-7 km).

Read more
Const of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel

Const of internal approach path, drains for providing all-weather vehicular, pedestrian connectivity to the control room building and associated electrical infrastructure at 132kv s/s, almora, including provisions for safe movement of oandm personnel

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)

Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha

Consultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.

Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.

Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).

Read more
Consultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).

Read more
Consultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.

Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise