Tender Details
Particulars | Details |
---|---|
Title |
Supply, Installation, Testing And Commissioning For Creation Of Different Capacity Sub Stations Along With Ht/Lt Network On Full Turnkey Basis Ut Capex 2024 25
|
Description |
Supply, Installation, Testing And Commissioning For Creation Of Different Capacity Sub Stations Along With Ht/Lt Network On Full Turnkey Basis Ut Capex 2024 25
|
Organisation | Power Development and Non-Renewable Energy | State Govt. and UT |
Tender Id | 2024_PDNRE_14443_1 |
Reference Number |
E-NIT NO. 80 OF 2024-25 |
Tender Fee | 580 |
EMD | 1.4 Lakh |
Tender Value | |
Place | Kargil |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=35936 |
Start Date | October 11, 2024 15:30 |
End Date |
16/10/2024 ( Expired 206 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreImplementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreConstruction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Construction of 220/132 kv, 1x160 mva and 132/33 kv, 1x40/50 mva gss betina jaisalmer with cap bank bay incl. survey, supply of all equipment/materials, erection (incl civil), testing and commissioning (turnkey project) against rvpn/ehv/bn9019002502
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSupply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi
Tender for supply, installation, testing, and
 commissioning of hospital laundry equipment on
 turnkey basis with 02 years comprehensive
 warranty on buy-back basis and operation of
 laundry services for a period of 10 years at aiims.
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreof your Industry type