Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Bridge With Bug Girder (Span 1x 54.00 M) At Ch. 387.00m Over Dipa River.(Work Shall Be Executed At Chainage 387.00m Over Kuntor River.
|
| Description |
Construction Of Rcc Bridge With Bug Girder (Span 55.00m) At Ch. 387.00m Over Kuntor River.
|
| Organisation | National Rural Road Development Agency (NRRDA) |
| Tender Id | 2023_CEAR_129183_1 |
|
Reference Number |
AR2106046C |
| Tender Fee | 10000 |
| EMD | 8.9 Lakh |
| Tender Value | - |
| Place | O/o the SE, RWC,Pasighat, East Siang Distt (AP) |
| Link |
View Original Tender Notice
https://pmgsytenders.gov.in |
| Start Date | November 13, 2023 15:30 |
| End Date |
Expired
27/11/2023
Expired 1053 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)
Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)
Read moreSsi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb
Read moreSsi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b
Read moreScor construction organization - nadikudi - srikalahasti new bg line project - proposed construction of left over works of important bridge no.357 at ch.252961.46m across river penna with substructure for double line on double d well foundations and super structure for single line with 25x45.7m open web steel girder (rdso 17181/1 to 17181/19) between atmakur and obulayapalle stations in andhra pradesh.
Scor construction organization - nadikudi - srikalahasti new bg line project - proposed construction of left over works of important bridge no.357 at ch.252961.46m across river penna with substructure for double line on double d well foundations and super structure for single line with 25x45.7m open web steel girder (rdso 17181/1 to 17181/19) between atmakur and obulayapalle stations in andhra pradesh.
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreConstruction of rcc bridge with bug girder (span 2 x 50.00m) at ch. 1600.00m over kuntor river (work shall be executed at chainage 1600.00m over komo river.)
Construction of rcc bridge with bug girder (span 2 x 50.00m) at ch. 1600.00m over komo river
Read moreConstruction of rcc bridge with bug girder span 2 x 50.00m at ch. 4100.00m over komo river. the work shall be executed at chainage 4100.00m over pale-8 river.)
Construction of rcc bridge with bug girder at ch. 4100.00m of road mrl04-lkb alg bro road to dipa (8.25km) over pale-8 river
Read moreC/o rcc bridge with bug girder span 1x55m over drum river
Jungle clearance, foundation, substructure, superstructure, river training work
Read moreof your Industry type