Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Permanent Campus Under Phase 1 A Sw: Providing False Ceiling Ac Duct And Corridor Of First Floor In C06 At Sahyadri Campus
|
Description |
Construction Of Permanent Campus Under Phase 1 A Sw Providing False Ceiling Ac Duct And Corridor Of First Floor In C06 At Sahyadri Campus
|
Organisation | Indian Institute of Technology Palakkad | Autonomous Bos |
Tender Id | 4987 |
Reference Number |
17/IITPKD/EWD/2023-24/050 |
Tender Fee | 0 |
EMD | 11140 |
Tender Value | |
Place | IIT Palakkad-EWD-Kerala-Palakkad |
Link | https://mhrd.euniwizarde.com/ |
Start Date | January 03, 2024 19:45 |
End Date |
16/01/2024 ( Expired 509 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of c.c road in gali no. 05 and 06
Construction of c.c road in gali no. 05 and 06&#x0d at kot mohalla under ward 31
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreof your Industry type