Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm I Unit Iv Cleaning Inspection Of Jack Oil Line Pipes From Bearing Pedestals To Jack Oil Pump Renewal Of Packing Clamps Renewal Of Defective Jop Pipe Line And Painting In Unit Iv During Aoh
|
Description |
Mtps I Tm I Unit Iv Cleaning Inspection Of Jack Oil Line Pipes From Bearing Pedestals To Jack Oil Pump Renewal Of Packing Clamps Renewal Of Defective Jop Pipe Line And Painting In Unit Iv During Aoh
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463246_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT.100 / 2024-25 |
Tender Fee | 0 |
EMD | 1400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550541 |
Start Date | July 16, 2024 17:30 |
End Date |
22/07/2024 ( Expired 323 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Read moreMtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Read moreMtps i chp ii mechanical sub division erection of 150 nb ms erw pipes with bends from ash handling pump house stage i high pressure pump to fire water pipe line
Mtps i chp ii mechanical sub division erection of 150 nb ms erw pipes with bends from ash handling pump house stage i high pressure pump to fire water pipe line
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreMtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreTtps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Ttps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Read moreMtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Mtps i mp unit iv overhauling of gravimetric feeders and clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4a to 4f
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreof your Industry type