Tender Details

Particulars Details
Title
E Rf P 01/Se(prog)/Sd/Kmda Of 2024 2025 (3 Rd Call)
Description
Preparation Of Gis Based Comprehensive Drainage Master Plan Including Dpr For .. At Project Area From Bally Khal In South To Dvc Canal In North And Ganga River In East To Delhi Road In West (Including Buffer Zone Of 5 Km)(3rd Call)
Organisation KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT
Tender Id 2025_KMDA_811588_1
Reference
Number
eRfP 01/SE(Prog)/SD/KMDA OF 2024-2025
Tender Fee 0
EMD 1 Lakh
Tender Value
Place Hooghly
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1804589
Start Date February 07, 2025 00:25
End Date

24/03/2025 ( Expired 50 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Operation, maintenance and guarding of all pumping machinery at intake and wtp site, 800kva substation, gaseous chlorination system at 2.4 mgd water treatment plant at lakshmanpur, under purulia mechanical division. p.h.e. dte.

Read more
Wbphed/02/bwn of se/cc of 2025-2026 sl.no.4

Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&amp#x0d &amp#x0d &amp#x0d

Read more
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call

Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call

Read more
01 of ee(el) of 2025-26 of ee/wbswc

Construction of 1800mt new food godown within bishnupur ridf campus, south 24-parganas----electrical installation works.

Read more
Wbpwd(r)/se/chc/nib-01/25-26/1 / collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.

Collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.

Read more

Detailed design, drawing, construction, commissioning, trial (03 months) and operation and maintenance for 05(five) years of intake.......diamond harbour municipality, district- south 24 parganas, west bengal under amrut 2.0 on turnkey basis.

Read more

Detailed design, drawing, construction, commissioning, trial (03 months) and operation and maintenance for 05(five) years of intermediate booster...south 24 parganas, west bengal under amrut 2.0 on turnkey basis.

Read more
Construction of main nala in main road (both sides) (01)neharu tiraha se suresh gupta ke dukan tak.(02)hanuman mandir se ramsumiran gupta house.(03)ramsumiran gupta house to jayprakash verma house drain work.

Construction of main nala in main road (both sides) (01) neharu tiraha se suresh gupta ke dukan tak.(02) hanuman mandir se ramsumiran gupta house.(03) ramsumiran gupta house to jayprakash verma house drain work.&amp#x0d

Read more

Shifting of utilities like sewerage line, manholes and drains&amp#x0d etc damaged due to lowering of primary, distribution and&amp#x0d raw water pipeline......urban water supply scheme of halisahar&amp#x0d municipality under amrut 2.0

Read more

Nirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise