Tender Details

Particulars Details
Title
Construction Of Roof Top Rain Water Harvesting
Description
Construction Of Roof Top Rain Water Harvesting&Amp#X0d And Ground Water Recharging At Primary School&Amp#X0d Panchayat Sachivalya Aanganwadi Panchgaon&Amp#X0d Patti Amar Singh Primary School Ladpura Rajpura&Amp#X0d Block Rajpura Distt Meerut
Organisation Office of The Director Ground Water Department | State Govt. and UT
Tender Id 2024_UPGWD_929536_1
Reference
Number
04/SGGWD/MRT/R.W.H
Tender Fee 854
EMD 39700
Tender Value
Place as per tender document
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1884755
Start Date May 15, 2025 23:30
End Date

22/05/2025 ( Expired 18 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Construction of 3 new ferryboats

Construction of 3 new ferryboats

Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project

Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep

Read more
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km

Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to

Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to

Read more
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 113.25 to 160.75 47.500 km

Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 113.25 to 160.75 47.500 km

Read more
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 55.725 to 113.25 57.525 km

Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 from km 55.725 to 113.25 57.525 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise