Tender Details
Particulars | Details |
---|---|
Title |
Supplying,Delivery And Installation Of Computer Periferals Alongwith Routine Softwares Maintenance Of 19 Nos P Cs Installed For The Office Of The Ee/Dwsd/Phe Dte (1 Yr) (O And Mtc)
|
Description |
Supplying,Delivery And Installation Of Computer Periferals Alongwith Routine Softwares Maintenance Of 19 Nos P Cs Installed For The Office Of The Ee/Dwsd/Phe Dte (1 Yr) (O And Mtc)
|
Organisation | PHE | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 10700 |
Tender Value | |
Place | Nababhat |
Link |
AAAAAAAAAA Login to view |
Start Date | April 24, 2025 14:30 |
End Date |
02/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying,delivery and installation of computer periferals alongwith routine softwares maintenance of 19 nos pcs installed for the office of the ee/dwsd/phe dte (1 yr) (o and mtc)
Supplying,delivery and installation of computer periferals alongwith routine softwares maintenance of 19 nos pcs installed for the office of the ee/dwsd/phe dte (1 yr) (o and mtc)
Read moreEngagement of 1 (one) no qualified personnel through agency for utilization of computer and other peripherals installed including typing of official correspondence etc. for office of the executive engineer, jhargram division, p.h.e. dte. at raghunat
Engagement of 1 (one) no qualified personnel through agency for utilization of computer and other peripherals installed including typing of official correspondence etc. for office of the executive engineer, jhargram division, p.h.e. dte. at raghunat
Read moreAnnual maintenance and operation of 02 nos. 11 tone centralized air conditioner plant and routine checking the same in one shift installed at computer building (agm section) under gm unit, piparwar area for a period of 01 year.
Annual maintenance and operation of 02 
 nos. 11 tone centralized air conditioner 
 plant and routine checking the same in one 
 shift installed at computer building (agm 
 section) under gm unit, piparwar area for a 
 period of 01 year
Read moreBiennial work contract for assistance in day to day routine, office work of 03 nos. division and ee (office) o/o s.e.(et/i-iii) of 210 mw atps mppgcl chachai.
Biennial work contract for assistance in day to day routine, office work of 03 nos. division and ee (office) o/o s.e.(et/i-iii) of 210 mw atps mppgcl chachai.
Read moreRoutine operation and maintenance of different water pump sets installed at marine dockyard, dss office complex, jawahar colony and dollygunj jawahar colony during 2023-24. sw supplying of electrical materials
Routine operation and maintenance of different water pump sets installed at marine dockyard, dss office complex, jawahar colony and dollygunj jawahar colony during 2023-24. sw supplying of electrical materials
Read moreEngagement of 05 nos gr-d staff contractual through agency for 9 months as per categoreis for the office of the ee/dwsd /phe dte (w.e.f. 01.04.2025 to 31.12.2025)
Engagement of 05 nos gr-d staff contractual through agency for 9 months as per categoreis for the office of the ee/dwsd /phe dte (w.e.f. 01.04.2025 to 31.12.2025)
Read moreO and mtc of distribution system ,rising main ,sluice valves including operation of sluice valves of bhahadurpur pwss under dwsd, phe dte (6 months)
O and mtc of distribution system ,rising main ,sluice valves including operation of sluice valves of bhahadurpur pwss under dwsd, phe dte (6 months)
Read moreMtc of ei in nrb at chandigarh. (comprehensive maintenance of additional turnstile gates and x-ray baggage scanner installed at gate nos. 2, 3 and 4 in punjab and haryana high court, sector 1, chandigarh).
Mtc of ei in nrb at chandigarh. (comprehensive maintenance of additional turnstile gates and x-ray baggage scanner installed at gate nos. 2, 3 and 4 in punjab and haryana high court, sector 1, chandigarh).
Read moreA. maintenance of inverter system with battery set, 12v, 150 ah installed at wb 1, 2, 3, 4, 5 and jrd sdg wb1/wb2 and dmo office room near wb1 (boq 1-5), b. repairing and maintenance of 10 nos. of computer system (acer veriton m200-8350), (dell optip
A. maintenance of inverter system with battery set, 12v, 150 ah installed at wb 1, 2, 3, 4, 5 and jrd sdg wb1/wb2 and dmo office room near wb1 (boq 1-5), b. repairing and maintenance of 10 nos. of computer system (acer veriton m200-8350), (dell optip
Read moreMaintenance of pwd(wr) jirania sub-division office under pwd division no-i during the year 2024-25/sh_- construction of 1(one) nos sbdtw by manual means and euipments provided by the contractor including installation of pump electrical panel
Maintenance of pwd(wr) jirania sub-division office under pwd division no-i during the year 2024-25/sh_- construction of 1(one) nos sbdtw by manual means and euipments provided by the contractor including installation of pump electrical panel
Read moreof your Industry type