Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply, Installation, Testing And Commissioning Of Electrical And Mechanical E And M Works Of 12 Nos. Of Stations In Reach 2 Extension And 2 Nos. Of Depots Under Nagpur Metro Rail Project Phase 2
|
Description |
Supply, Installation, Testing And Commissioning Of Electrical And Mechanical E And M Works Of 12 Nos. Of Stations In Reach 2 Extension And 2 Nos. Of Depots Under Nagpur Metro Rail Project Phase 2
|
Organisation | Government of Maharashtra |
Tender Id | 2023_MMRCL_961605_1 |
Reference Number |
N2-027/E AND M-02/2023 |
Tender Fee | 59000 |
EMD | 35 Lakh |
Tender Value | |
Place | The office of ED Procurement, Maha-Metro Nagpur |
Link | https://mahatenders.gov.in |
Start Date | November 09, 2023 23:00 |
End Date |
12/12/2023 ( Expired 571 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreEmpanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read moreSupply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Supply, installation, testing and commissioning of high volume air sampler and portable air sampler at project site in nd(v)
Read moreSupply, installation, testing and commissioning of digital pocket dosimeter at project site in nd(v)
Supply, installation, testing and commissioning of digital pocket dosimeter at project site in nd(v)
Read moreSupply, installation, testing and commissioning of digital contamination monitor at project site in nd(v)
Supply, installation, testing and commissioning of digital contamination monitor at project site in nd(v)
Read morePre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Read moreMaintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Maintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreof your Industry type