Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Chc Niyamtabad Chandauli (Sit Work)
|
Description |
Construction Of Balance Work Chc Niyamtabad Chandauli (Sit Work)
|
Organisation | UP Rajkiya Nirman Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 3.21 Lakh |
Tender Value | |
Place | CHANDAULI |
Link |
AAAAAAAAAA Login to view |
Start Date | June 19, 2025 23:00 |
End Date |
03/07/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreImplementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIndigenous development of restraining gear for aircraft carriers
Design ,development, manufacturing, testing, supply, preservation, installation, alignment, setting to work, commissioning, acceptance and trials of restraining gear and associated system and accessories for aircraft carriers, as per sotrs
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreof your Industry type