Tender Details
Particulars | Details |
---|---|
Title |
P/F Of Tile Flooring, Painting Work In System Lab And Kota Stone Work At Store Room Of Machine And Drive Laboratary, Dept. Of Electrical Engg., Iit Bhu, Varanasi
|
Description |
P/F Of Tile Flooring, Painting Work In System Lab And Kota Stone Work At Store Room Of Machine And Drive Laboratary, Dept. Of Electrical Engg., Iit Bhu, Varanasi
|
Organisation | Indian Institute of Technology(BHU) Varanasi | Central Govt. Ministry/Department |
Tender Id | 2024_IITBU_828112_1 |
Reference Number |
IIT(BHU)/IWD/CT-28/2024-25/136 |
Tender Fee | 1180 |
EMD | 16000 |
Tender Value | |
Place | Institute Works Department, |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=883850 |
Start Date | December 23, 2024 21:30 |
End Date |
13/01/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation and commissioning of software and database for simulating the precipitation kinetics at dept. of metallurgical engg., iit(bhu) varanasi.
Tender for supply, installation and commissioning of software and database for simulating the precipitation kinetics at dept. of metallurgical engg., iit(bhu) varanasi.
Read moreRenovation of fracture analysis lab, aluminium work at room no. 610 physics dept, 3rd floor of irh, hindi cell at old library, p/f of shutter at surveying lab, p/f of roller blinds at various locations and fixing film at 4th floor central library
Renovation of fracture analysis lab, aluminium work at room no. 610 physics dept, 3rd floor of irh, hindi cell at old library, p/f of shutter at surveying lab, p/f of roller blinds at various locations and fixing film at 4th floor central library
Read morePainting work at rangarajapuram two wheeler subway electrical work in dn134 zone x and dismantling the damaged wearing coat laying of steel fiber reinforced paver blocks in the riding surface electrical works at duraiswamy subway in div133
Painting work at rangarajapuram two wheeler subway electrical work in dn134 zone x and dismantling the damagedwearing coat laying of steel fiber reinforced paver blocks inthe riding surface electrical works at duraiswamy subway in&#x0d div133
Read moreProvn of civil work for insite development of co2 laser laboratory in room no 7 8 of p 219 internal external painting work in bldg no p236 p237 repair repainting work of periphery wall near yamuna hostel repair replacement at diat du girinagfar pune
Provn of civil work for insite development of co2 laser laboratory in room no 7 8 of p 219 internal external painting work in bldg no p236 p237 repair repainting work of periphery wall near yamuna hostel repair replacement at diat du girinagfar pune
Read moreRepair and maintenance, sanitary work, painting of control room, office room, dg room and store room etc. and other miscellaneous work at 132/33 kv gss latehar.
Repair and maintenance, sanitary work, painting of control room, office room, dg room and store room etc. and other miscellaneous work at 132/33 kv gss latehar.
Read moreManpower outsourcing services and supply of material for operation and maintenance of electrical installation in zone-1, solar pv and solar heating system at iit roorkee campus
Manpower outsourcing services and supply of material for operation and maintenance of electrical installation in zone-1, solar pv and solar heating system at iit roorkee campus
Read moreElectrical installation work and air conditioning system including timer at rest room of doctors and nursing staffs, illumination of staircase, corridor and toilet area of chhatna ssh, chhatna, bankura, 2nd call.
Electrical installation work and air conditioning system including timer at rest room of doctors and nursing staffs, illumination of staircase, corridor and toilet area of chhatna ssh, chhatna, bankura, 2nd call.
Read moreElectrical installation work and air conditioning system including timer at rest room of doctors and nursing staffs of onda ssh, onda, bankura,2nd call.
Electrical installation work and air conditioning system including timer at rest&#x0d room of doctors and nursing staffs of onda ssh, onda, bankura,2nd call.
Read moreRepair replacement of tiling pcc kota stone wall tilling plumbing fixing joinery and other connected work at unit location of 222 abod md otm accn in the aor of age br i under ge narangi
Repair replacement of tiling pcc kota stone wall tilling plumbing fixing joinery and other connected work at unit location of 222 abod md otm accn in the aor of age br i under ge narangi
Read moreConstruction of dg room with replacement of ac and minor repair work in sub sldc building at sakatpura, kota
Construction of dg room with replacement of ac and minor repair work in sub sldc building at sakatpura, kota
Read moreof your Industry type