Tender Details
Particulars | Details |
---|---|
Title |
Kota Stone Flooring In Class Room No. 3 And 4 Of Mahamana Vidyalaya In Hyderabad Colony, Bhu.
|
Description |
Kota Stone Flooring In Class Room No. 3 And 4 Of Mahamana Vidyalaya In Hyderabad Colony, Bhu.
|
Organisation | Banaras Hindu University | Central Govt. Ministry/Department |
Tender Id | 2025_BHU_797515_1 |
Reference Number |
BHU/UWD/WO/2025-26/14 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | UWD, BHU, VARANASI |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1102099 |
Start Date | May 08, 2025 20:30 |
End Date |
13/05/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreAnnual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Annual overhauling of turbine and generator of unit no.-3 of 3x210mw, atps, anpara
Read moreof your Industry type