Tender Details

Particulars Details
Title
Utility Shifting For Belgaon Mlp And Dungripalli Mlp Scheme Of Cluster Xiv, Megalift Projects Division, Titilagarh Due To Construction Of Two Lane With Paved Shoulder Including Land Acquisition From Km 56/860 To Km 68/369 Of Nh 59 (Rigdol To Belgaon)
Description
Pipe Line Work/ Road Work
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_853346_1
Reference
Number
05 / EE NH (BGR) of 2024-25
Tender Fee 10000
EMD 55700
Tender Value
Place Rigdol to Belgaon
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=897108
Start Date March 19, 2025 16:30
End Date

02/04/2025 ( Expired 19 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan

Read more
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode

Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.

Read more
Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.

Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.

Read more
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode

Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise