Tender Details
Particulars | Details |
---|---|
Title |
Rewinding Of 75 Three Phase Induction Motor Of Lift Irrigation Scheme Kanispora.
|
Description |
Rewinding Of 75 Three Phase Induction Motor Of Lift Irrigation Scheme Kanispora.
|
Organisation | Government of Jammu and Kashmir |
Tender Id | 2023_IFC_226460_5 |
Reference Number |
eNIT 12 of 2023-24 |
Tender Fee | 50 |
EMD | 920 |
Tender Value | |
Place | Mech. Irrig. Div. Baramulla |
Link | https://jktenders.gov.in |
Start Date | August 16, 2023 23:30 |
End Date |
22/08/2023 ( Expired 661 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of agency under swadesh darshan 2.0 scheme for development, operations, maintenance and management of tourism experience - tripura heritage and sangeet experience at agartala phase-i and ii
Selection of agency under swadesh darshan 2.0 scheme for development, operations, maintenance and management of tourism experience - tripura heritage and sangeet experience at agartala phase-i and ii
Read moreUnder iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &#x0d &#x0d
Read moreOperation and maintenance of nagalwadi micro lift irrigation scheme mentioned in nit.
Operation and maintenance of nagalwadi micro lift irrigation scheme mentioned in nit.
Read moreSupply, installation, commisisoning, onsite testing and calibration of three phase energy meter on door delivery basis at hbl plant sugauli
Supply, installation, commisisoning, onsite testing and calibration of three phase energy meter on door delivery basis at hbl plant sugauli
Read moreProviding new borewell (150mm dia) with three phase 3.0 hp submergible motor with necessary pipeline arrangements to meet out the water demand for earth pits, office usage etc., at narasingampatty 110/33-11 kv sub station
Providing new borewell (150mm dia) with three phase 3.0 hp submergible motor with necessary pipeline arrangements to meet out the water demand for earth pits, office usage etc., at narasingampatty 110/33-11 kv sub station
Read moreUpgradation of electric distribution sys from single phase to three phase for offrs md accn and certain provision works at leimakhong mil stn
Upgradation of electric distribution sys from single phase to three phase for offrs md accn and certain provision works at leimakhong mil stn
Read moreSitc of two nos of centrifugal pump having capacity 70 m3/h and induction motor having capacity 100hp and 40 hp for water treatment plant at south campus of iit mandi.
Sitc of two nos of centrifugal pump having capacity 70 m3/h and induction motor having capacity 100hp and 40 hp for water treatment plant at south campus of iit mandi.
Read moreConstruction of mukhya mantri solar lift irrigation scheme padariya, block- mandu, dist- ramgarh.
Construction of mukhya mantri solar lift irrigation scheme padariya, block- mandu, dist- ramgarh.
Read moreConstruction of mukhya mantri solar lift irrigation scheme dari, block-dari, dist- hazaribagh.
Construction of mukhya mantri solar lift irrigation scheme dari, block-dari, dist- hazaribagh.
Read moreProvisioning of arboriculture for new three squadrons as part of infrastructure augmentation at ina, ezhimala- nap phase-ii
As per boq and tender documents
Read moreof your Industry type