Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Construction Of Road Over Bridges (Ro Bs) For The Ministry Of Railways 🚂🏗️ The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of Two Road Over Bridges (Ro Bs) As Part Of The Khurda Road Division's Infrastructure Development: 1. Construction Of A 1x60 Mtr. Bow String Girder And 2x18 Mtr. Composite Girder Rob At Rly. Km 555/5 7. 2. Construction Of A 1x60 Mtr. Bow String Girder Rob At Rly. Km 611/22 24. Bid Submission Deadline: 28/06/2024, 3:00 Pm ⏳ Earnest Money Deposit (Emd): Inr 19,38,500 Interested Contractors Must Submit Detailed Tenders, Including Project Execution Plans, Cost Estimates, And Compliance With Safety And Quality Standards. Keywords: Construction, Road Over Bridge, Rob, Ministry Of Railways, Infrastructure, Civil Works, Tender, Khurda Road Division, Government Contract| Particulars | Details |
|---|---|
| Title |
(1)construction Of Road Over Bridge(rob) Span(1x60 Mtr. Bow String Girder 2x18 Mtr. Composite Girder) At Rly. Km 555/5 7 In Lieu Of Lc No.274 Between Rba Hma Stations And (2)construction Of Road Over Bridge(rob)span (1x60 Mtr. Bow String Girder) At Rly. Km 611/22 24 In Lieu Of Lc No.320 Between Bam Gta Stations On Bhc Psa Main Line Of Khurda Road Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75514149 |
|
Reference Number |
e-Tender-SPL-KUR-99-2024 |
| Tender Fee | 0 |
| EMD | 19.39 Lakh |
| Tender Value | - |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75514149/viewNitPdf_4595223.pdf |
| Start Date | June 06, 2024 17:14 |
| End Date |
Expired
28/06/2024
Expired 839 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreInspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Read moreConstruction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Read moreConsultancy service construction of 1x50 mtr span steel truss girder bridge over nallah qazinag at tad
Consultancy service construction of 1x50 mtr span steel truss girder bridge over nallah qazinag at tad
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read more1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.
Read more(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
Read more1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push
Read moreof your Industry type