Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Re Railing Equipment For 210 Mw Atps Mppgcl Chachai 🚂 Madhya Pradesh Power Generating Company Limited (Mppgcl) Invites Bids From Reputable Suppliers For The Procurement Of Re Railing Equipment For The 210 Mw Atps Mppgcl Chachai Project. 🏭 📅 Bid Submission Deadline: April 10, 2024, 3:00 Pm Tender Fee: Inr 1523 Emd: Inr 88,500 Interested Suppliers Must Provide Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Project's Requirements And Industry Standards. Keywords: Re Railing Equipment, Procurement, Madhya Pradesh Power Generating Company Limited, Atps Mppgcl Chachai, State Govt. And Ut, Tender, Early Market Deposit| Particulars | Details |
|---|---|
| Title |
Construction Of New Mrf Sheds (All Weather Proof) At Govt School, Una Road And Mrf Shed, Fire Brigade Hoshiarpur
|
| Description |
Construction Of New Mrf Sheds (All Weather Proof) At Govt School, Una Road And Mrf Shed, Fire Brigade Hoshiarpur
|
| Organisation | Department of Local Government | State Govt. and UT |
| Tender Id | 2024_MPPGC_331848_1 |
|
Reference Number |
2270 |
| Tender Fee | 4540 |
| EMD | 60000 |
| Tender Value | |
| Place | hoshiarpur |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=249311 |
| Start Date | June 21, 2024 15:45 |
| End Date |
Expired
01/07/2024
Expired 734 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreProviding and laying of wbm road at lhs- 11a & 11b tail end and boiler maintenance i&r shed area
Providing and laying of wbm road at lhs- 11a & 11b tail end and boiler maintenance i&r shed area
Read moreWidening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes. recall
Widening and strengthening of existing perimeter road at tezu airport for the purpose of crash fire tender of 36.0 tonnes. recall
Read moreExtension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreConstruction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Construction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Read moreSpecial repair to bldg no p-307 apu and 02 x toilet inside tech area of 506 abw jabalpur and provn of parking shed at offrs residential accn at tipu sultan road, cod estate under ge (e) jabalpur
Special repair to bldg no p-307 apu and 02 x toilet inside tech area of 506 abw jabalpur and provn of parking shed at offrs residential accn at tipu sultan road, cod estate under ge (e) jabalpur
Read moreSupplying all labour t and p for laying of distribution network pipeline installation of sluice valve and chamber damaged during pwd road widening work at pws to badabharandi and pujariguda of badabharandi g.p under umerkote block
Supplying all labour t and p for laying of distribution network pipeline installation of sluice valve and chamber damaged during pwd road widening work at pws to badabharandi and pujariguda of badabharandi g.p under umerkote block
Read moreSelection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Selection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Read moreC/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
C/o ors accommodation, stable and training shed at camp of 48 bn itbp at an altitude of 12600 feet and a distance of approx. 18 km from chungthang, distt-mangan, north sikkim connected with road and further approx. 9 km on foot from nearest roadhead
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreof your Industry type