Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 08 Toilet , Two Septic Tank, 10 Bathroom
|
Description |
Construction Of 08 Toilet, Two Septic Tank And 10 N Os Bathroom Near 08 Nos P.F Huts At Composite Hospital.
|
Organisation | DG,CRPF,MHA | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 84652 |
Tender Value | |
Place | Composit Hospital AT GC CRPF New Delhi |
Link |
AAAAAAAAAA Login to view |
Start Date | May 31, 2025 14:30 |
End Date |
09/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of additional class room at bala krushna bidya niketan, jignipur, gp jignipur.
Construction of additional class room at bala krushna bidya niketan, jignipur, gp jignipur.
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreof your Industry type