Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
To Provide Consultancy Services For The Preparation Of Economic Feasibility Report Of The Project Considering The Existing Facilities, Detailed Project Report, Epc Tender Specification,Etc For The Supply And Erection Of Wagon Tippler Etc
|
| Description |
To Provide Consultancy Services For The Preparation Of Economic Feasibility Report Of The Project Considering The Existing Facilities, Detailed Project Report, Epc Tender Specification,Etc For The Supply And Erection Of Wagon Tippler Etc
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_368389_1 |
|
Reference Number |
COAL-139/2023-24 |
| Tender Fee | 0 |
| EMD | 20000 |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 11, 2023 19:30 |
| End Date |
Expired
10/10/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of feasibility report and detailed project report (dpr) for development of a four lane ring road around the jharia coalfields in the state of jharkhand.
Consultancy services for preparation of feasibility report and detailed project report (dpr) for development of a four lane ring road around the jharia coalfields in the state of jharkhand.
Read morePreparation of detailed feasibility report/detailed project report for the installation of air-conditioned bus shelters under the public private partnership model within the avadi corporation limits.
Preparation of detailed feasibility report/detailed project report for the installation of air-conditioned bus shelters under the public private partnership model within the avadi corporation limits.
Read moreRfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Rfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Read morePreparation of detailed feasibility report (dfr) cum detailed project report (dpr) for rejuvenation and exploring the mode of water metro transport along the buckingham canal from ennore to mahabalipuram
Preparation of detailed feasibility report (dfr) cum detailed project report (dpr) for rejuvenation and exploring the mode of water metro transport along the buckingham canal from ennore to mahabalipuram
Read moreConsultancy services for preparation of feasibility report and detailed project report (dpr) for upgradation to 6 lane of ranchi hazaribagh section of nh 33 (from km 41.500 to km 114.000) in the state of jharkhand
Consultancy services for preparation of feasibility report and detailed project report (dpr) for upgradation to 6 lane of ranchi hazaribagh section of nh 33 (from km 41.500 to km 114.000) in the state of jharkhand
Read moreConsultancy services to prepare detailed project report for construction of medical college at jagatsingpur, odisha.
Consultancy services to prepare detailed project report for construction of medical college at jagatsingpur, odisha.
Read moreConsultancy services to prepare detailed project report for construction of medical college at dhenkanal, odisha.
Consultancy services to prepare detailed project report for construction of medical college at dhenkanal, odisha.
Read moreConsultancy services to prepare detailed project report for construction of medical college at bhadrak, odisha.
Consultancy services to prepare detailed project report for construction of medical college at bhadrak, odisha.
Read moreConsultancy services for preparation of dpr /feasibility report for new mumbai-pune greenfield expressway in the state of maharashtra (approx. length 130 km)
Consultancy services for preparation of dpr /feasibility report for new mumbai-pune greenfield expressway in the state of maharashtra (approx. length 130 km)
Read moreConsultancy services for preparation of detailed project report (dpr) for spur from kota to rawatbhata in the state of rajasthan
Consultancy services for preparation of detailed project report (dpr) for spur from kota to rawatbhata in the state of rajasthan
Read moreof your Industry type