Tender Details
Particulars | Details |
---|---|
Title |
Alignment, Levelling And Centering Of Unit No. Ii Of 2 X11.25 Mw Ganvi Power House Stage I.
|
Description |
Alignment, Levelling And Centering Of Unit No. Ii Of 2 X11.25 Mw Ganvi Power House Stage I.
|
Organisation | HPSEBL | State Govt. and UT |
Tender Id | 2025_HPSEB_101597_1 |
Reference Number |
HPSEBL/GPHD/DB-9/2024-25-54 |
Tender Fee | 590 |
EMD | 4956 |
Tender Value | |
Place | JEORI |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=150469 |
Start Date | March 19, 2025 21:30 |
End Date |
25/03/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreConstruction of cc drain ward no. 20 near house of basant soni shahdol as per nit and estimate.
Construction of cc drain ward no. 20 near house of basant soni shahdol as per nit and estimate.
Read moreRenovation and modernisation of maithon hydel station unit 1 and 3 (2 x 20 mw)
Renovation and modernisation of maithon hydel station unit 1 and 3 (2 x 20 mw)
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreAnnual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Annual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreof your Industry type