Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) Crn 4441 Fly Ash C
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/B/6522658 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 01, 2025 21:21 |
| End Date |
Expired
11/08/2025
Expired 427 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreSupply of 40mm gi pipes for silo system laying of proposed air pipe line from stage-i vacuum pump house to silo utility building in ash handling systems of cam division/stage-i/btps
Supply of 40mm gi pipes for silo system laying of proposed air pipe line from stage-i vacuum pump house to silo utility building in ash handling systems of cam division/stage-i/btps
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - crn 4466 mechanica
Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - crn 4471 biennial
Read more
of your Industry type