Tender Details

Particulars Details
Title
Construction Work Of Smart Road From Keruganj Chauraha Pakad Chowki Via Stp And Gaushala To Nh 30 Shahjahanpur Bareilly Highway In Distt Shahjahanpur (Fin Year 2025 26)
Description
Construction Work Of Smart Road From Keruganj Chauraha Pakad Chowki Via Stp And Gaushala To Nh 30 Shahjahanpur Bareilly Highway In Distt Shahjahanpur (Fin Year 2025 26)
Organisation Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2725
EMD 29 Lakh
Tender Value
Place SHAHJAHANPUR
Link

AAAAAAAAAA

Login to view
Start Date May 08, 2025 17:30
End Date

20/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvements from km167/600 to 187/600 of nh85 (old nh-49e) (kochi -madurai-thondi road) on (epc) basis contract under annual plan 2025-26 in the state of tamilnadu

Improvements from km167/600 to 187/600 of nh85 (old nh-49e) (kochi -madurai-thondi road) on (epc) basis contract under annual plan 2025-26 in the state of tamilnadu

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1

Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)

Read more

Nirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.

Read more
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec

Read more
Nie-t-31/2025-26 (sl. no. 19)

Construction of cc road from abdul khaleks land to obaidul mohrils house in sripur-i and sripur-ii gp under ratua-ii block in the district of malda. (length- 1.82 km, width- 3.75 m).

Read more
Vibrated rubber molded cc interlocking tiles road and drain construction work in ward no. 21 mohd. azad vihar from moti house to pappu singh house in khoda-makanpur.

Vibrated rubber molded cc interlocking tiles road and drain construction work in ward no. 21 mohd. azad vihar from moti house to pappu singh house in khoda-makanpur.

Read more
Construction of road from kasli to binjasi via netarwas bhuwala and ladwa distt-sikar

Construction of road from kasli to binjasi via netarwas bhuwala and ladwa distt-sikar

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Widening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.

Widening and strengthening from achpura-kasindra road up to nh-14 (nh-27) and construction of bridge work at ch. km-3/00.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise