Tender Details
Particulars | Details |
---|---|
Title |
Laying Underground 200 Mm Dia Ac Mazza 2.5 Kg/Sqcm Pressure Pipeline For Dewatering Of Flood Water From Low Laying Fields Of Village Baniyani To Outfall Rd 1800 R Of Baniyani Sub Link Drain
|
Description |
Laying Underground 200 Mm Dia Ac Mazza 2.5 Kg/Sqcm Pressure Pipeline For Dewatering Of Flood Water From Low Laying Fields Of Village Baniyani To Outfall Rd 1800 R Of Baniyani Sub Link Drain
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2180 |
EMD | 19120 |
Tender Value | |
Place | BANIYANI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 26, 2025 18:30 |
End Date |
02/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nit 32 work of construction and commissioning of 05 nos bore hole of 200 mm dia and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months defect liability
Nit 32 work of construction and commissioning of 05 nos bore hole of 200 mm dia and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months defect liability
Read moreFlood risk mitigation by laying of rcc pipeline of dia 600mm (3000 ft approx.) through field to carry out excessive rain water to kuraiwala ennakhera malout link drain from low lying fields of village jhorar (dhani baba rudh singh) in district sri mu
Flood risk mitigation by laying of rcc pipeline of dia 600mm (3000 ft approx.) through field to carry out excessive rain water to kuraiwala ennakhera malout link drain from low lying fields of village jhorar (dhani baba rudh singh) in district sri mu
Read moreLaying 250 mm dia mazza ac pipe (2.5 kg/cm2) for dewatering of flood water fro low laying area of fields of village behlba into south behlba link drain rd 14500/r
Laying 250 mm dia mazza ac pipe (2.5 kg/cm2) for dewatering of flood water fro low laying area of fields of village behlba into south behlba link drain rd 14500/r
Read moreLaying underground 200 mm dia ac mazza 2.5 kg/sqcm pressure pipeline for dewatering of flood water from low laying fields of village baniyani to outfall rd 1800-r of baniyani sub link drain
Laying underground 200 mm dia ac mazza 2.5 kg/sqcm pressure pipeline for dewatering of flood water from low laying fields of village baniyani to outfall rd 1800-r of baniyani sub link drain
Read moreProviding and laying of 570 mtr. mazza ac pipe 300 mm dia class 20 (10 kg/sqm) including all cost of material, labour and tool and plant etc at akaradiya kala pump canal in district lucknow .
Providing and laying of 570 mtr. mazza ac pipe 300 mm dia class 20 (10 kg/sqm) including all cost of material, labour and tool and plant etc at akaradiya kala pump canal in district lucknow .
Read moreA/r m/o other pwd roads under sub-division-iii, srd project division-i, pwd new delhi during 2025-26. sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe n
A/r m/o other pwd roads under sub-division-iii, srd project division-i, pwd new delhi during 2025-26. sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe n
Read moreA/r and m/o other pwd roads under sub-division-iii, srd project division-i, pwd new delhi during 2025-26 sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe ne
Sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe near kashmere gate metro station gate no. 3 to cross drain
Read moreEstimate for construction of 03 nos. sump well and laying di pipeline for dewatering the flood water into outfall channel rd. 90000 of gurgoan canal from village-hassanpur
Estimate for construction of 03 nos. sump well and laying di pipeline for dewatering the flood water into outfall channel rd. 90000 of gurgoan canal from village-hassanpur
Read moreNit 28 work of construction and commissioning of 05 nos bore hole of 200 mm dia and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months defect liability
Nit 28 work of construction and commissioning of 05 nos bore hole of 200 mm dia and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months defect liability
Read moreWork of construction and commissioning of 02 nos bore hole by dth/rotary/ combination/odex rig of 200 mm dia tube well and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months dl period
Work of construction and commissioning of 02 nos bore hole by dth/rotary/ combination/odex rig of 200 mm dia tube well and providing, laying, jointing and testing of pipeline and other allied works under sub div. virat nagar with 24 months dl period
Read moreof your Industry type