Tender Details

Particulars Details
Title
Wbphed/Ee/Mlmd/N Ie T 32 Of 2024 25
Description
Operation And Maintenance Of Submersible Sludge Pump, Dewatering And Multipurpose Pump With Horizontal Submersible Mixture At Dariapur Of Southern Sector Under Malda Arsenic Area Water Supply Scheme, (Phase Ii).
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_790803_1
Reference
Number
WBPHED/EE/MLMD/NIeT_32 of 2024-2025
Tender Fee 0
EMD 21700
Tender Value
Place Doulatpur PHE-Complex, Maliha, Malda,732102
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1757951
Start Date December 30, 2024 20:00
End Date

17/01/2025 ( Expired 143 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja

Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Read more
Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Biennial rc for chemical supply and service on turnkey basis for cooling water treatment at cw systems of stage ii under chemical laboratory at ktps

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district

Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district

Read more
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme

Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme

Read more
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise