Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Maintenance Of Pragna Bhaban During The Year 2024 2025 Sh Construction Of Boundary Wall Around The Pragna Bhaban (Length 200.00 Mtr, Phase Ii).
|
Description |
Maintenance Of Pragna Bhaban During The Year 2024 2025 Sh Construction Of Boundary Wall Around The Pragna Bhaban (Length 200.00 Mtr, Phase Ii).
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 4000 |
EMD | 1.42 Lakh |
Tender Value | |
Place | Agartala |
Link |
AAAAAAAAAA Login to view |
Start Date | June 24, 2025 22:40 |
End Date |
10/07/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/c098-000-cd-t-8104/1003 construction of boundary wall around the shri ram mandir complex in ayodhya
Construction of boundary wall around the shri ram mandir complex in ayodhya
Read moreRaising of boundary wall and other miscellaneous repair and maintenance work ,painting works of boundary wall etc at hazaribag sub-station and konar sub-station under gomd -v,dvc, hazaribagh
Raising of boundary wall and other miscellaneous repair and maintenance work ,painting works of boundary wall etc at hazaribag sub-station and konar sub-station under gomd -v,dvc, hazaribagh
Read moreConstruction of operational boundary wall around the airfield
Construction of operational boundary wall around the airfield
 replacing the existing fencing at igrua, fursatganj airport
Read moreAnnual maintenance of 3702 nos. of street light light deolali
Annual maintenance of 3702 nos. of street light 
 points in deolali cantonment during the year 
 2025-26 and 2026-27
Read moreMtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00
Read moreShort term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26
Short term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26
Read moreMaintenance of works through stmc of nh-702 from km.0/000 (namtola) to km.10/600 (sonari) (total length 10.600 km.) under pwd jorhat nh division, jorhat in the state of assam for the year 2025-26.
Maintenance of works through stmc of nh-702 from km.0/000 (namtola) to km.10/600 (sonari) (total length 10.600 km.) under pwd jorhat nh division, jorhat in the state of assam for the year 2025-26.
Read moreWork of construction of new boundary wall and fencing around the 66 kv sub station sangna amritsar
Work of construction of new boundary wall and fencing around the 66 kv sub station sangna amritsar
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read morePr surfacing of husnar xing to lala ganpat rai cotton factory at gidderbaha mktodr 08 rd 0.00 to 2.32 kms proposed length rd 0.00 to 2.32 km. incl. maintenance of road for 5 years one year dlp and 4 years maintenance period
Pr surfacing of husnar xing to lala ganpat rai cotton factory at gidderbaha mktodr 08 rd 0.00 to 2.32 kms proposed length rd 0.00 to 2.32 km. incl. maintenance of road for 5 years one year dlp and 4 years maintenance period
Read moreof your Industry type