Tender Details

Particulars Details
Title
Maintenance Of Pragna Bhaban During The Year 2024 2025 Sh Construction Of Boundary Wall Around The Pragna Bhaban (Length 200.00 Mtr, Phase Ii).
Description
Maintenance Of Pragna Bhaban During The Year 2024 2025 Sh Construction Of Boundary Wall Around The Pragna Bhaban (Length 200.00 Mtr, Phase Ii).
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 4000
EMD 1.42 Lakh
Tender Value
Place Agartala
Link

AAAAAAAAAA

Login to view
Start Date June 24, 2025 22:40
End Date

10/07/2025 ( 14 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Raising of boundary wall and other miscellaneous repair and maintenance work ,painting works of boundary wall etc at hazaribag sub-station and konar sub-station under gomd -v,dvc, hazaribagh

Raising of boundary wall and other miscellaneous repair and maintenance work ,painting works of boundary wall etc at hazaribag sub-station and konar sub-station under gomd -v,dvc, hazaribagh

Read more
Construction of operational boundary wall around the airfield

Construction of operational boundary wall around the airfield&#x0d replacing the existing fencing at igrua, fursatganj airport

Read more
Annual maintenance of 3702 nos. of street light light deolali

Annual maintenance of 3702 nos. of street light &#x0d points in deolali cantonment during the year &#x0d 2025-26 and 2026-27

Read more
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Read more
Short term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26

Short term maintenance of nh-627, (gaspara to hakram) from km-16.00 to km-22.00 and km- 31.00 to km-62.900 (total length 38.90 km) of nh-627, under bakulia nh division diphu, in the state of assam for the year 2025-26

Read more
Maintenance of works through stmc of nh-702 from km.0/000 (namtola) to km.10/600 (sonari) (total length 10.600 km.) under pwd jorhat nh division, jorhat in the state of assam for the year 2025-26.

Maintenance of works through stmc of nh-702 from km.0/000 (namtola) to km.10/600 (sonari) (total length 10.600 km.) under pwd jorhat nh division, jorhat in the state of assam for the year 2025-26.

Read more
Work of construction of new boundary wall and fencing around the 66 kv sub station sangna amritsar

Work of construction of new boundary wall and fencing around the 66 kv sub station sangna amritsar

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Pr surfacing of husnar xing to lala ganpat rai cotton factory at gidderbaha mktodr 08 rd 0.00 to 2.32 kms proposed length rd 0.00 to 2.32 km. incl. maintenance of road for 5 years one year dlp and 4 years maintenance period

Pr surfacing of husnar xing to lala ganpat rai cotton factory at gidderbaha mktodr 08 rd 0.00 to 2.32 kms proposed length rd 0.00 to 2.32 km. incl. maintenance of road for 5 years one year dlp and 4 years maintenance period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise