Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
In Kanhaiya Nagar Of Ward No. 19 Sant Nagar, Construction Of Interlocking And Rcc Drain With Colored Strips On Cc Road From Shivcharan To Talaiya And Both Side Tracks And Plantation Work With Tree Guard On The Side Track.
|
| Description |
In Kanhaiya Nagar Of Ward No. 19 Sant Nagar, Construction Of Interlocking And Rcc Drain With Colored Strips On Cc Road From Shivcharan To Talaiya And Both Side Tracks And Plantation Work With Tree Guard On The Side Track.
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2023_DOLBU_871929_14 |
|
Reference Number |
- |
| Tender Fee | 11710 |
| EMD | 6.51 Lakh |
| Tender Value | - |
| Place | Firozabad |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1485226 |
| Start Date | December 19, 2023 14:30 |
| End Date |
Expired
09/01/2024
Expired 1013 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
In ward no. 19 phulwadi, road improvement by cc from rajaram yadav house to sant nagar ambedkar tiraha, tree plantation work by colored interlocking along with side track and tree guard.
In ward no. 19 phulwadi, road improvement by cc from rajaram yadav house to sant nagar ambedkar tiraha, tree plantation work by colored interlocking along with side track and tree guard.
Read moreIn ward no. 33 moh. ganesh nagar, drain repair from police chowki service road to yadav dairy jain nagar road, widening of the road by hotmix and installation of colored interlocking on both side tracks and plantation with tree guards.
In ward no. 33 moh. ganesh nagar, drain repair from police chowki service road to yadav dairy jain nagar road, widening of the road by hotmix and installation of colored interlocking on both side tracks and plantation with tree guards.
Read moreRoad improvement work by cc from radhe-radhe to kamlesh gupta house near the railway crossing in datauji khurd of ward no. 45, 48 and work of planting trees and tree guards on the side tracks along with colored strips on the side tracks.
Road improvement work by cc from radhe-radhe to kamlesh gupta house near the railway crossing in datauji khurd of ward no. 45, 48 and work of planting trees and tree guards on the side tracks along with colored strips on the side tracks.
Read moreIn ward no. 45 datauji kalan, datauji square, from dr. subhash shop to the slope of the culvert, construction of footpath with colored strip along with hotmix and tree guard and tree plantation work.
In ward no. 45 datauji kalan, datauji square, from dr. subhash shop to the slope of the culvert, construction of footpath with colored strip along with hotmix and tree guard and tree plantation work.
Read moreIn ward no. 19 phulwadi, road improvement by cc from dhakare marriage home to chhota mata mandir, plantation work by colored interlocking along with side track and tree guard.
In ward no. 19 phulwadi, road improvement by cc from dhakare marriage home to chhota mata mandir, plantation work by colored interlocking along with side track and tree guard.
Read moreTree plantation works using miyawaki method for the development of dense forest strips on both sides of the nh on gunabiaora, mubarakpurbiaora, obditarsi section of nh46 as part of densification and beautification of nh stretches approaching/ing
Tree plantation works using miyawaki method for the development of dense forest strips on both sides of the nh on gunabiaora, mubarakpurbiaora, obditarsi section of nh46 as part of densification and beautification of nh stretches approaching/ing
Read moreTree plantation and maintenance (nurturing trees) on both sides of roads and govt. buildings capuses under p.w.division, beed (total length 207.80 km)
Tree plantation and maintenance (nurturing trees) on both sides of roads and govt. buildings capuses under p.w.division, beed (total length 207.80 km)
Read moreWard no. 19 - fatehabad road in govardhan ki thar, road improvement by cc from mata mandir to mukut singh, plantation work by colored interlocking along with side track and tree guard.
Ward no. 19 - fatehabad road in govardhan ki thar, road improvement by cc from mata mandir to mukut singh, plantation work by colored interlocking along with side track and tree guard.
Read moreWard no. 25 construction of cc road from nagla bhau uma factory to gt culvert, construction of side track, side development by colored interlocking and plantation work with rcc tree guard.
Ward no. 25 construction of cc road from nagla bhau uma factory to gt culvert, construction of side track, side development by colored interlocking and plantation work with rcc tree guard.
Read moreIn ward no. 12 kakrau, repair of drain in the damaged road from pari sutering wala to mahendra singh yadav house, construction of road by cc, installation of colored interlocking tiles on the side track and tree plantation with tree guard.
In ward no. 12 kakrau, repair of drain in the damaged road from pari sutering wala to mahendra singh yadav house, construction of road by cc, installation of colored interlocking tiles on the side track and tree plantation with tree guard.
Read moreof your Industry type