Work Of Replacement Of Weasel Conductors And Rabbit Conductors In 11 Kv Lines, Installation Of P.C.C. Poles In Long Spans And Increasing The Capacity Of Transformers Etc To Be Done On Semi Turnkey Basis Under Bp 23 24 In The Area Of Modinagar
Description
Work Of Replacement Of Weasel Conductors And Rabbit Conductors In 11 Kv Lines, Installation Of P.C.C. Poles In Long Spans And Increasing The Capacity Of Transformers Etc To Be Done On Semi Turnkey Basis Under Bp 23 24 In The Area Of Modinagar
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNL_833681_1
Reference
Number
30/2023-24/EDC/GZB
Tender Fee 3540
EMD 12000
Tender Value -
Place Superintending Engineer EDC Ghaziabad
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date August 30, 2023 17:40
End Date
Expired 04/09/2023

Expired 1135 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
11 kv 30 kn strain disc hardware for rabbit (acsr 7 3.35mm) and weasel (acsr 7 2.59mm) conductors

11 kv 30 kn strain disc hardware for rabbit (acsr 7 3.35mm) and weasel (acsr 7 2.59mm) conductors - 7000 sets

Read more
Supply and delivery of composite hardware fittings, for acsr weasel and rabbit conductors, at jhargram divisional store, jhargram

Supply and delivery of composite hardware fittings comprising of cross arm strap, ball clevis and socket tongue and tension clamp to be used for acsr weasel, rabbit conductors with relevant is standard at jhargram divisional store

Read more
For the work of electrical work replacement of old weasel conductors with new dog conductors and replacement of poles and worn out, insulated wires between long spans on araon road, shikohabad road, pegu road on semi-turnkey basis under business plan

For the work of electrical work replacement of old weasel conductors with new dog conductors and replacement of poles and worn out, insulated wires between long spans on araon road, shikohabad road, pegu road on semi-turnkey basis under business plan

Read more
Procurement of 11 kv 30 kn strain disc hardware for rabbit acsr 7 3.35 mm and weasel acsr 7 2.59mm conductors

Procurement of 11 kv 30 kn strain disc hardware for rabbit acsr 7 3.35 mm and weasel acsr 7 2.59mm conductors

Read more
After increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld

After increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld

Read more
Work of installation/increasing capacity/protection of distribution transformer in the area of edd modinagar on semi-turnkey basis

Work of installation/increasing capacity/protection of distribution transformer in the area of edd modinagar on semi-turnkey basis

Read more
Re-conductoring of old deteriorated squirrel/weasel acsr conductor by rabbit conductor of lt circuits of distribution transformers in moodbidri section, moodabidre o&m sub-division of kavoor division

Re-conductoring of old deteriorated squirrel/weasel acsr conductor by rabbit conductor of lt circuits of distribution transformers in moodbidri section, moodabidre o&m sub-division of kavoor division

Read more
Work of replacement of damaged vcb and strengthening of 33/11 kv sub-stations under edd modinagar should be done on semi-turnkey basis under business plan 23-24.

Work of replacement of damaged vcb and strengthening of 33/11 kv sub-stations under edd modinagar should be done on semi-turnkey basis under business plan 23-24.

Read more
Work of increasing capacity of distribution transformers and installation work of new distribution transformers on semi-turnkey basis in business plan 2025-26 under the area of edc, agra

Work of increasing capacity of distribution transformers and installation work of new distribution transformers on semi-turnkey basis in business plan 2025-26 under the area of edc, agra

Read more
To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)

To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise