Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Replacement Of Weasel Conductors And Rabbit Conductors In 11 Kv Lines, Installation Of P.C.C. Poles In Long Spans And Increasing The Capacity Of Transformers Etc To Be Done On Semi Turnkey Basis Under Bp 23 24 In The Area Of Modinagar
|
| Description |
Work Of Replacement Of Weasel Conductors And Rabbit Conductors In 11 Kv Lines, Installation Of P.C.C. Poles In Long Spans And Increasing The Capacity Of Transformers Etc To Be Done On Semi Turnkey Basis Under Bp 23 24 In The Area Of Modinagar
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNL_833681_1 |
|
Reference Number |
30/2023-24/EDC/GZB |
| Tender Fee | 3540 |
| EMD | 12000 |
| Tender Value | - |
| Place | Superintending Engineer EDC Ghaziabad |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | August 30, 2023 17:40 |
| End Date |
Expired
04/09/2023
Expired 1135 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
11 kv 30 kn strain disc hardware for rabbit (acsr 7 3.35mm) and weasel (acsr 7 2.59mm) conductors
11 kv 30 kn strain disc hardware for rabbit (acsr 7 3.35mm) and weasel (acsr 7 2.59mm) conductors - 7000 sets
Read moreSupply and delivery of composite hardware fittings, for acsr weasel and rabbit conductors, at jhargram divisional store, jhargram
Supply and delivery of composite hardware fittings comprising of cross arm strap, ball clevis and socket tongue and tension clamp to be used for acsr weasel, rabbit conductors with relevant is standard at jhargram divisional store
Read moreFor the work of electrical work replacement of old weasel conductors with new dog conductors and replacement of poles and worn out, insulated wires between long spans on araon road, shikohabad road, pegu road on semi-turnkey basis under business plan
For the work of electrical work replacement of old weasel conductors with new dog conductors and replacement of poles and worn out, insulated wires between long spans on araon road, shikohabad road, pegu road on semi-turnkey basis under business plan
Read moreProcurement of 11 kv 30 kn strain disc hardware for rabbit acsr 7 3.35 mm and weasel acsr 7 2.59mm conductors
Procurement of 11 kv 30 kn strain disc hardware for rabbit acsr 7 3.35 mm and weasel acsr 7 2.59mm conductors
Read moreAfter increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld
After increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld
Read moreWork of installation/increasing capacity/protection of distribution transformer in the area of edd modinagar on semi-turnkey basis
Work of installation/increasing capacity/protection of distribution transformer in the area of edd modinagar on semi-turnkey basis
Read moreRe-conductoring of old deteriorated squirrel/weasel acsr conductor by rabbit conductor of lt circuits of distribution transformers in moodbidri section, moodabidre o&m sub-division of kavoor division
Re-conductoring of old deteriorated squirrel/weasel acsr conductor by rabbit conductor of lt circuits of distribution transformers in moodbidri section, moodabidre o&m sub-division of kavoor division
Read moreWork of replacement of damaged vcb and strengthening of 33/11 kv sub-stations under edd modinagar should be done on semi-turnkey basis under business plan 23-24.
Work of replacement of damaged vcb and strengthening of 33/11 kv sub-stations under edd modinagar should be done on semi-turnkey basis under business plan 23-24.
Read moreWork of increasing capacity of distribution transformers and installation work of new distribution transformers on semi-turnkey basis in business plan 2025-26 under the area of edc, agra
Work of increasing capacity of distribution transformers and installation work of new distribution transformers on semi-turnkey basis in business plan 2025-26 under the area of edc, agra
Read moreTo overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
Read moreof your Industry type