Tender Details
Particulars | Details |
---|---|
Title |
General Action Plan 2024 2025 Pvip Annual Maintenance Of Perumbavoor Branch Canal From Ch 3 300 Km To Tail End And Its Fc
|
Description |
General Action Plan 2024 2025 Pvip &Amp#X0d
Annual Maintenance Of Perumbavoor Branch&Amp#X0d
Canal From Ch 3 300 Km To Tail End And Its&Amp#X0d
Fc
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_690891_1 |
Reference Number |
ET-16/AEE2/PVIP/2024-25/S |
Tender Fee | 690 |
EMD | 7806 |
Tender Value | |
Place | Perumbavoor |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1075340 |
Start Date | September 11, 2024 22:00 |
End Date |
18/09/2024 ( Expired 264 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreRepair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Repair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreof your Industry type