Tender Details

Particulars Details
Title
Transporting And Replacement Of Damaged 02 Nos. Gear, 02 Nos Motor, Brackets, Top Roller, Bottom Roller Including Transportatin From Surface To Tb 2, Tb 4, 19 Dip Belt, And Tb 5 Belt At Mail. Lncline Of Shankarpur Coliery
Description
Transporting And Replacement Of Damaged 02 Nos. Gear, 02 Nos Motor, Brackets, Top Roller, Bottom Roller Including Transportation From Surface To Tb 2, Tb 4, 19 Dip Belt, And Tb 5 Belt At Mail. Lncline Of Shankarpur Coliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_302455_1
Reference
Number
ECL/GM/BA/E TENDER/23-24/EnM/332 Dt. 22.02.2024
Tender Fee 0
EMD 5000
Tender Value -
Place Shankarpur Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=313311

Start Date February 23, 2024 23:30
End Date
Expired 04/03/2024

Expired 958 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Installation and commissioning of 1000 mm wide x 140 mtr long belt conveyor at 25l 58 dip to 62 dip at mill incline of shankarpur colliery

Installation and commissioning of 1000 mm wide x 140 mtr long belt conveyor at 25l 58 dip to 62 dip at mill incline of shankarpur colliery

Read more
Installation and commissioning of 1000mm wide x 245 mtr. long belt conveyor at 26l and 51 dip to 58 dip at mill. incline of shankarpur colliery

Installation and commissioning of 1000mm wide x 245 mtr. long belt conveyor at 26l and 51 dip to 58 dip at mill. incline of shankarpur colliery

Read more
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery

Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery

Read more
Dismantling and transporting 400mt belt structure,1000mm belt from companion level gallery up to 500mt chainage from 6th dip, transporting 1200mm belt structure from inside the 10thrise of companion level gallery,between 450m to 850mt chainage and m

Dismantling and transporting 400mt belt structure,1000mm belt from companion level gallery up to 500mt chainage from 6th dip, transporting 1200mm belt structure from inside the 10thrise of companion level gallery,between 450m to 850mt chainage and m

Read more
Transporting of total 500 mtr conveyor structures belt accessories including loading. unloading and transportation manually from shankarpur colliery to kumardihi a colliery

Transporting of total 500 mtr conveyor &#x0d structures belt accessories including loading. &#x0d unloading and transportation manually from &#x0d shankarpur colliery to kumardihi a colliery

Read more
Transporting of total 500 mtr conveyor structures belt accessories including loading. unloading and transportation manually from shankarpur colliery to kumardihi a colliery

Transporting of total 500 mtr conveyor structures belt accessories including loading. unloading and transportation manually from shankarpur colliery to kumardihi a colliery

Read more
Installation and commissioning of 1000mm. wide x150 mtr. long belt conveyor at 30l and 54 dip to 58 dip and 10 mtr. discharge point at mill. incline of shankarpur colliery

Installation and commissioning of 1000mm. wide x150 mtr. long belt conveyor at 30l and 54 dip to 58 dip and 10 mtr. discharge point at mill. incline of shankarpur colliery

Read more
Replacement of damaged bottom idler 228 nos and top idler 190 nos by new top and bottom idler at tb 1 tb 2 and 19 dip 1st and 2nd belt including lowering transportation and fitting at mill incline of shankarpur colliery under bankola area.

Replacement of damaged bottom idler 228 nos and top idler 190 nos by new top and bottom idler at tb 1 tb 2 and 19 dip 1st and 2nd belt including lowering transportation and fitting at mill incline of shankarpur colliery under bankola area.

Read more
Replacement of damaged 1000mm wide belt by good quality 1000mm wide belt 480 mtr at tb 2 200mtr and 30l belt 280 mtr 480 mtr mill incline of shankarpur colliery

Replacement of damaged 1000mm wide belt by good quality 1000mm wide belt 480 mtr at tb 2 200mtr and 30l belt 280 mtr 480 mtr mill incline of shankarpur colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise