Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Cad Cwph I Upkeepement And Attending Minor Repair Works For Ensuring Uninterrupted And Smooth Running Of Cooling Water Pumps And Tws In Unit I, Ii And Iii For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Cad Cwph I Upkeepement And Attending Minor Repair Works For Ensuring Uninterrupted And Smooth Running Of Cooling Water Pumps And Tws In Unit I, Ii And Iii For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527481_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.61/25-26 |
Tender Fee | 0 |
EMD | 17800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628107 |
Start Date | February 24, 2025 23:00 |
End Date |
10/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
For hiring diesel generator set along with operator on monthly rent basis for the office use of ee 33 kv line, ee 11 kv line-north/south, ee com-i/com-ii and se eudc meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).
For hiring diesel generator set along with operator on monthly rent basis for the office use of ee 33 kv line, ee 11 kv line-north/south, ee com-i/com-ii and se eudc meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).
Read moreFinancial year 2025-2026 (from 01.04.2025 to 31.03.2026) to provide 03 no. sel powered vehicles with driver for the use of edd-i, bulandshahr, edsd-ii, gulaothi and edsd-iii, sikandrabad.
Financial year 2025-2026 (from 01.04.2025 to 31.03.2026) to provide 03 no. sel powered vehicles with driver for the use of edd-i, bulandshahr, edsd-ii, gulaothi and edsd-iii, sikandrabad.
Read moreMtps i m ii oahs fam pdfacs unit iii attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reasse
Mtps i m ii oahs fam pdfacs unit iii attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reasse
Read moreGrass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Grass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps operation circle chemical division plant operation works of dm plant-i ii, collection of swas samples, dosing of chemicals, collection of stator water and hydrogen gas samples at express lab-i ii on round the clock basis for 6 months
Ttps operation circle chemical division plant operation works of dm plant-i ii, collection of swas samples, dosing of chemicals, collection of stator water and hydrogen gas samples at express lab-i ii on round the clock basis for 6 months
Read moreJob work required for operation and maintenance in irrigation and non irrigation period of v.t. pumps with allied mechanical and electrical equipments including tools, tackles and safety equipments at urmodi lift irrigation scheme stage i and ii for
Job work required for operation and maintenance in irrigation and non irrigation period of v.t. pumps with allied mechanical and electrical equipments including tools, tackles and safety equipments at urmodi lift irrigation scheme stage i and ii for
Read moreFor hiring light motor diesel vehicle (along with driver) on monthly rent basis for the use of ee and ae-i, ii and iii, under eudd-11 kv south and lt line, meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).
For hiring light motor diesel vehicle (along with driver) on monthly rent basis for the use of ee and ae-i, ii and iii, under eudd-11 kv south and lt line, meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).
Read moreof your Industry type