Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Cad Cwph I Lifting Of The Trash Rack Screen From The Cwph I Fore Bay, Cleaning Of The Debris And Re Erection In Its Position For Unit I, Ii And Iii For The Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Cad Cwph I Lifting Of The Trash Rack Screen From The Cwph I Fore Bay, Cleaning Of The Debris And Re Erection In Its Position For Unit I, Ii And Iii For The Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527484_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.62/25-26 |
Tender Fee | 0 |
EMD | 7600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628111 |
Start Date | February 24, 2025 23:05 |
End Date |
10/03/2025 ( Expired 86 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Nctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Read moreTtps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Ttps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Read moreTtps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreGrass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Grass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Read moreNctps ii m i circle ca cwph unit i ii cleaning of fore bay trash rack in cooling water
Nctps ii m i circle ca cwph unit i ii cleaning of fore bay trash rack in cooling water
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreCleaning the roof tops of various buildings such as power house, switchyard 1 and cwph 1 of unit 1 to 3 and clearing away the deposits to far off place for the period from 01.04.2025 to 31.03.2026
Cleaning&#x0d the roof tops of various buildings such as power house, switchyard 1 and cwph 1 of unit 1 to 3 and clearing away&#x0d the deposits to far off place for the period from 01.04.2025 to&#x0d 31.03.2026
Read moreNctps i cm circle cm i service building sweeping cleaning and mopping floors removing the garbage from each floor and dumping into 0 m dust bin for the period of one year from 01.04.2025 to 31.03.2026
Nctps i cm circle cm i service building sweeping cleaning&#x0d and mopping floors removing the garbage from each floor and dumping into 0 m dust&#x0d bin for the period of one year from 01.04.2025 to 31.03.2026
Read moreof your Industry type