Tender Details

Particulars Details
Title
For The C/ O Rcc Water Storage Tank At Village Priyungal In Gp Kailla Under Apo Chamba During 2023 24
Description
For The C/ O Rcc Water Storage Tank At Village Priyungal In Gp Kailla Under Apo Chamba During 2023 24
Organisation Government of Himachal Pradesh
Tender Id 2023_CPD1_82054_1
Reference
Number
TENDER / WORKS / 260 / 2023-24
Tender Fee 500
EMD 25000
Tender Value
Place VPO Chowari
Link https://hptenders.gov.in
Start Date November 30, 2023 22:00
End Date

14/12/2023 ( Expired 544 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Read more
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Read more
Repair to sewage line and cleaning of manhole, septic tank and allied b/r work in zone iv, repair and replacment of unserviceable water tanks, roof treatment and allied services of zone iii and iv at umroi mil stn under ge umroi

Repair to sewage line and cleaning of manhole, septic tank and allied b/r work in zone iv, repair and replacment of unserviceable water tanks, roof treatment and allied services of zone iii and iv at umroi mil stn under ge umroi

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut&amp#x0d 2.0 phase-iii within amc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise