Tender Details

Particulars Details
Title
Construction Of Gabion Wall Including Security Fencing Nearby Tower Area And Along The Old Collapsed Portion Adjacent To Newly Constructed Retaining Wall At Akashvani Madikeri Karnataka Construction Of Gabion Wall Including Security Fencing Nearby Tower Area And Along The Old Collapsed Portion Adjacent To Newly Constructed Retaining Wall At Akashvani Madikeri Karnataka
Description
Construction Of Gabion Wall Including Security Fencing Nearby Tower Area And Along The Old Collapsed Portion Adjacent To Newly Constructed Retaining Wall At Akashvani Madikeri Karnataka
Organisation Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos
Tender Id 2025_PrasarBharati_26228
Reference
Number
05/ SEC/CCW/AIR/CHN/2025-26
Tender Fee 0
EMD 62873
Tender Value -
Place Delhi
Link
View Original Tender Notice

https://prasarbharati.eproc.in

Start Date April 29, 2025 22:00
End Date
Expired 20/05/2025

Expired 515 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 02(two) nos. works at newly constructed synthetic football field located at uttar gakulnagar, twikarma, lichubagan under mungiakami rd block, khowai district namely i. paver block approach road ii. retaining wall.

Construction of 02(two) nos. works at newly constructed synthetic football field located at uttar gakulnagar, twikarma, lichubagan under mungiakami rd block, khowai district namely i. paver block approach road ii. retaining wall.

Read more
Shifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur

Shifting of 11kv line, lt line and transformer during work of construction of road and retaining wall for approach road of newly constructed bridge in u/s of dehradun ambala road xing in district saharanpur

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka.

Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka.

Read more
Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka

Construction of gabion wall including security fencing nearby tower area and along the old collapsed portion adjacent to newly constructed retaining wall at akashvani madikeri karnataka

Read more
Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).

Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).

Read more
Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).

Reconstruction of collapsed retaining wall near staff quarter at akashvani, chawnpui, aizawl (mizoram).

Read more
Reconstruction of 30mts collapsed security fencing wall rear side portion of scob at akashvani, kothagudem.

Reconstruction of 30mts collapsed security fencing wall rear side portion of scob at akashvani, kothagudem.

Read more
Auction of newly constructed shop no. 05 above the constructed shops adjacent to the municipal boundary (unreserved)

Auction of newly constructed shop no. 05 above the constructed shops adjacent to the municipal boundary (unreserved)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise